0120011-J0 Rev M
24
6� LPS36 System Installation
•
Remove all metallic jewelry; e.g., watches, rings, metal rimmed glasses, necklaces.
•
Wear safety glasses with side shields (and prescription lenses if necessary) at all times during installation.
•
Use insulated metallic tools.
Installers should follow all applicable local rules and regulations for electrical and battery installations; e.g., CSA, UL,
CEC, NEC, OSHA, and local fire codes.
This chapter is provided for qualified personnel to install an LPS36 system.
6.1 General Instructions
This chapter provides cabling details and notes on cable sizing for DC applications.
Connections to the converter system must comply with all the local codes and ordinances.
6.2 Safety Precautions
WARNING!
The DC input to the modules (and the converter system) – though not dangerous in voltage –
has a high short circuit current capacity that may cause severe burns and electrical arcing.
The DC output is a potentially dangerous voltage. Do not touch the output connections when
under power. Ensure that power has been removed from the outputs before working on them.
WARNING!
The intra-building ports (Ethernet, CAN, alarm relays) of the equipment or subassembly are
suitable for connection to intra-building or unexposed wiring or cabling only. The intra-
building port(s) of the equipment or subassembly MUST NOT be metallically connected to
interfaces that connect to the OSP or its wiring. These interfaces are designed for use as
intra-building interfaces only (Type 2 or Type 4 ports) and require isolation from the exposed
OSP cabling. The addition of Primary Protectors is not sufficient protection in order to
connect these interfaces metallically to OSP wiring.
WARNING!
CXCI+ controller Ethernet port is not designed to withstand lightning and AC power cross
surges according to the NEBS requirements in GR-1089-CORE. Ensure that any Ethernet
cable used (not provided by Alpha) does not exceed a maximum length of 6 meters.
Before working with any live power system, take the following precautions:
Summary of Contents for alpha LPS36
Page 1: ...LPS36 Line Power System Technical Guide 0120011 J0 Effective 07 2020...
Page 2: ......
Page 4: ......
Page 85: ......