
Remove o ring.
Cut locator tab off.
Apply transitional solvent cement liberally
to both male and female surfaces.
Cement together.
OR
Cut a piece of 1 1/2” pipe to 3” long.
Apply pvc cement liberally to all surfaces.
Glue together.
Cut Header End Connector (HEC) in half, creating
a male and a female adapter. These ends are used
at the input and output of the array.
The HEC clips into place so that the plumbing can
be glued to the cut end.
The HEC can also be used as a spacer around vents
and chimneys.
JOIN ENDCAPS TO HEADERS
JOIN PLUMBING TO HEADERS
LOCATOR TAB
O RING
1
1/2
” PIPE
END CAP
END CAP
CUT HEC
CUT HEC
USE TEFLON ON ALL END CAPS
We recommend
Weld On 711 PVC
Cement
or a heavy-bodied pvc cement.
Ensure plumbing is straight.
Measure twice, cut once!
At any low points in plumbing, use a tee
and end cap. This will allow for drainage
for winter months.
6