A southern exposure is best, followed by west or
east. A northern exposure is not recommended.

IMPORTANT:

Angle panels 4 inches for every 

40 feet to drain water back to feed/supply inlet. 
Use chalk lines to reference angle.

FEED /SUPPLY LOWEST POINT

HIGHEST POINT

RETURN

When splitting system, try to balance 

with equal sections in each bank. 

Never plumb in series from small 

bank to a larger bank of sections.

INSTALLATION

TYPICAL SINGLE ROOF SYSTEM PLUMBING

TYPICAL SERIES ROOF  

TYPICAL PARALLEL ROOF  

END CAP

END CAP

END CAP

END CAP

RETURN

RETURN

FEED

FEED

RETURN

FEED

VENT SPACING

VENT

NEVER INSTALL FEED AND RETURN LINES ON THE SAME SIDE

3

Summary of Contents for Solar Panel

Page 1: ...It s easy SOLAR PANEL INSTALLATION GUIDE September 2008...

Page 2: ...llation we do not advise cutting into the roof or drilling lag bolts into the roof On ground installations panels should be insulated from the earth Enersol Products Inc it s agents distributors and s...

Page 3: ...e FEED SUPPLY LOWEST POINT HIGHEST POINT RETURN When splitting system try to balance with equal sections in each bank Never plumb in series from small bank to a larger bank of sections INSTALLATION TY...

Page 4: ...roof drainage For safety reasons do not mount panels against a pool Rack plywood should be mounted 45 or less Support headers with 2x6 lumber Panels may be set on any material that will insulate them...

Page 5: ...om and every 3 ft up thereafter Do not tighten cross strapping too tight to allow for expansion Apply generous amount of roofing cement Screw lag bolts through roofing cement into roof Use roof sealan...

Page 6: ...input and output of the array The HEC clips into place so that the plumbing can be glued to the cut end The HEC can also be used as a spacer around vents and chimneys JOIN ENDCAPS TO HEADERS JOIN PLU...

Page 7: ...ough system install a BALL VALVE between the feed and return lines Open the ball valve gradually to reduce flow or pressure to panels Follow manufacturers instructions for installation of automatic co...

Page 8: ...omote bacterial growth HEADER REPLACEMENT OR RUBBER REPLACEMENT TUBE REPAIR IF A SECTION DEVELOPS A LEAK WINTERIZATION SUMMERIZATION IN HOT CLIMATES Allow 5 or 10 minutes for O ring to seat Replace O...

Reviews: