background image

 

 

ENERdan GmbH | Max-Planck-Straße 7, D-12489 Berlin, Germany | 

www.enerpower.de

 

Tel: +49 (0) 30 5770 344 35 | Fax: +49 (0) 30 5770 344 39 | [email protected] 

 

 

1. General Information 

This manual elaborates the installation process of a TSDZ2 central motor drive system from 
Tongsheng, imported and distributed by ENERdan GmbH under the brand ENERpower. This 
manual will guide you step by step throughout the installation process.  

Before starting, please make sure you have all the supplied parts (see list in paragraph 4 of 
this document). 

2. Motor System Higlights 

 

Easy to install, suitable for most regular bikes                  

 

Maximum torque of about 80N.m, strong climbing ability  

 

Internal control axial torque sensor actual double-sided torque 

 

Compact, fine design, Lightweight (about 3.3 kg)  

 

Comfortable ride, high efficiency, low battery consumption and longer battery life 

 

Safe, reliable and excellent performance PCT/CN2014/091373 

3. Technical Details 

Motor 

 

Manufacturer: Tongsheng (China) 

 

Model: TSDZ2 

 

Motor type: mid-motor 

 

Wheel diameter: 16' - 28' 

 

Energy: 250W - 350W 

 

Voltage: 36V / 48V 

 

Torque: 50N.m - 80N.m 

 

Level of support: 36% ~ 300% 

 

Maximal speed: 25Km/h 

 

Weight: 3.3 Kg. 

Display 

 

Type: VLCD5 

 

Bus communication: U-ART or CAN 

 

Time display: single-way / total 

 

Distance display: single-way / total 

 

Power assist: adjustable, 5 levels 

 

Background light: 3 levels brightness 

 

Fault diagnosis function: intelligently identifies and shows the problem 

 

Measuring units: selectable, metric / anglo-american 

 

 

Summary of Contents for TSDZ2

Page 1: ...ENERdan GmbH Max Planck Stra e 7 D 12489 Berlin Germany www enerpower de Tel 49 0 30 5770 344 35 Fax 49 0 30 5770 344 39 sales enerdan de 1 TSDZ2 Central Motor Drive System Installation Manual...

Page 2: ...talling the arm cranks 7 6 Display Installation 8 Step 1 Installing the VLCD5 display 8 Step 2 Installing the left hand remote control buttons 8 7 Detective Sensor Installation 9 8 System Connection 9...

Page 3: ...ut 80N m strong climbing ability Internal control axial torque sensor actual double sided torque Compact fine design Lightweight about 3 3 kg Comfortable ride high efficiency low battery consumption a...

Page 4: ...1 3 VLCD5 display bracket 32 1 4 Left hand operator 1 5 Brake lever 1 optional 6 Detective sensor 1 7 Securing plate 1 8 M33 5mm bolt 1 9 Hanging plate 1 10 Securing block 1 11 M8 X 45 roundhead bolt...

Page 5: ...to the bicycle five way pipe in the direction of the arrow and the length of the five way pipe of 68mm the exposed length of the middle bushing is 11mm as shown in image 1 Image 1 Step 2 Installing th...

Page 6: ...e Screw the M33 5 nut onto the BB axle using an affiliated wrench by 40N m torque Please refer to Image 3 Image 3 Step 4 Fixing the main body of the motor Fix the main body of the Motor onto bike Fram...

Page 7: ...49 0 30 5770 344 35 Fax 49 0 30 5770 344 39 sales enerdan de 7 Step 5 Tightening the bolt Tighten the bolt with 40N m torque force Please refer to Image 5 Image 5 Step 6 Installing the arm cranks Usi...

Page 8: ...ion Step 1 Installing the VLCD5 display Install the LCD display onto the handlebar using 2pcs of M4 14 bolts and 2pcs of M4 nuts The bracket is 32 with adjust rings for different handlebar sizes Pleas...

Page 9: ...ear fork with two ribbons as shown below Image 9 2 Install the magnet steal onto the rear fork facing the detective sensor 3 Adjust the distance between sensor and magnet steel 4 The distance between...

Page 10: ...4 35 Fax 49 0 30 5770 344 39 sales enerdan de 10 Step 2 Inserting the brake levers plugs Insert the brake levers plugs into the display Please refer to Image 11 Note that the brake levers are optional...

Page 11: ...5770 344 35 Fax 49 0 30 5770 344 39 sales enerdan de 11 Step 4 Connecting the main motor and the detective sensor Please refer to Image 13 Image 13 Step 5 Connecting the motor and the battery Please r...

Page 12: ...ENERdan GmbH Max Planck Stra e 7 D 12489 Berlin Germany www enerpower de Tel 49 0 30 5770 344 35 Fax 49 0 30 5770 344 39 sales enerdan de 12 9 System Connection...

Page 13: ...ENERdan GmbH Max Planck Stra e 7 D 12489 Berlin Germany www enerpower de Tel 49 0 30 5770 344 35 Fax 49 0 30 5770 344 39 sales enerdan de 13 10 Motor Dimensions in mm...

Page 14: ...r This product complies with the following EC directives 2006 66 EC BATTERY DIRECTIVE 2001 95 EC DIRECTIVE FOR GENERAL PRODUCT SAFETY 2004 108 EC DIRECTIVE FOR ELECTROMAGNETIC COMPATIBILITY Applicable...

Reviews: