Rev 08/24/10
ENERGY KING™ Wood/Coal Boiler Owner’s Manual
U. S.
13
Installation
6.
Draft System.
a. Insert the conduit leading from your draft system
into the control box and tighten screw to secure.
b. Mount the pre-wired forced air draft blower to the
draft opening located next to the ash removal door
on the lower left front of the Boiler and secure
using the bolts found on the draft opening.
7.
Pressure-Temperature Gauge.
Insert the Pressure-
Temperature Gauge into the right-front receptacle
located on top of the Boiler.
8.
Pressure Relief Valve.
Insert the Pressure Relief
Valve into either the left-middle or right-middle
receptacle located on the top of the boiler. The
Pressure Relief Valve must be plumbed with a
discharge tube that empties into a floor drain. See
Plumbing
for further instructions.
Figure 4: Forced Air Draft Blower
Figure 3: Control Box for Forced Air Draft
Summary of Contents for 35EK-D
Page 2: ......
Page 4: ......
Page 43: ...Rev 08 24 10 ENERGY KING Wood Coal Boiler Owner s Manual U S 37 Appendix A Wiring Diagram...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......