EK3 Frontier Boiler Manual
16
Seventh Edition- October 2015
EXPANDED DIGITAL MANAGER
10 & 15 ZONE MANAGER INSTALLATION INSTRUCTIONS
1. Remove cover from junction box.
Use a free knockout on the top of the junction box to mount a second or third transformer, wire black lead to
“XFMR” and white lead to “NEUTRAL” on relay board in box. (Use sections marked “120 VOLTS” only.) A
second junction box is not needed for the expanded Digital Manager. Wire additional transformer(s) in parallel
with first transformer. To wire in parallel, wire terminal “A” on one transformer to “A” on the other. Repeat with
other low voltage terminal “B”. Verify 24VAC output from all transformers BEFORE reconnecting the Manager.
2. Mount long panel on top of box cover with long screws provided in lower 4 holes with spacers down.
3. Mount expanded Digital Manager to cover plate over 4 long screws and 2 wide bolts (top 2 holes).
4. Wire the bottom half of expanded manager as 5 zone Digital Manager. For top half, attach one thermostat lead
to a zone and the other to A1 on lower half of manager. Attach one lead from zone valve or relay to
corresponding zone output and the other lead to 24VAC on lower half.
5. Option switches control energy recovery for extra zone outputs (see Digital Manager Option Switch Settings).
NOTICE:
When operating without an expanded manager, use a service card for the bottom half and jumper upper
zones from T
(x)
to Z
(x).
10 ZONE MANAGER
15 ZONE MANAGER
FROM
TRANSFORMER
24V POWER
T3
TE
MP.
SENS
.
RED
SENSOR
LEADS
TEMP
SILVER
R
T4
S
BLACK
B
A2
A1
T1
T2
THW
TO A1
Z2
B2
CIRC
B1
T
MAIN CIRC RELAY
T
TO BURNER RELAY
24VAC
IND
Z3
ZONE VALVE 2
ZONE VALVE 3
ZHW
Z1
Z4
ZONE VALVE 1
ZONE VALVE 4
TO 24VAC
9
8
7
6
5
ZONE 5
ZONE 6
T5
T6
ZONE 8
ZONE 7
ZONE 9
T8
T7
T9
THERMOSTAT
HEATING
Z5
Z6
ZONE VALVE 5
ZONE VALVE 6
Z8
Z7
Z9
ZONE VALVE 8
ZONE VALVE 7
5
6
7
8
9
THERMOSTAT
ZONE 3
ZONE 1
ZONE 2
ZONE VALVE 9
T2
T4
A1
T3
B
A2
S
R
TE
M
P
. SEN
S.
10
10
T10
THW
T1
T7
T8
T6
T9
T5
7
5
6
8
9
7
5
6
8
9
THERMOSTAT
T13
T11
T14
T12
11
12
14
13
11
12
14
13
HEATING
Z1
CIRC
IND
B2
B1
Z2
Z3
24VAC
Z10
Z4
ZHW
Z5
Z6
Z8
Z7
Z9
Z13
Z12
Z11
Z14
ZONE 4
60
70
80
50
SYSTEM 2000
50
80
60
70
HEATING
INDUCER
BURNER
CIRCULATOR
140
MAKING ANY CONNECTIONS
READ INSTRUCTIONS BEFORE
MONITOR
120
100
130
CHIMNEYLESS
CAUTION
24 VAC CONNECTION ONLY.
190
160
150
170
POWER
ONLY
4
3
2
1
HOT WATER
THERMOSTAT
4
3
2
1
24 VAC CONNECTION ONLY.
CAUTION
READ INSTRUCTIONS BEFORE
MAKING ANY CONNECTIONS
4
POWER
MONITOR
170
150
160
190
130
100
120
140
CIRCULATOR
BURNER
INDUCER
ONLY
CHIMNEYLESS
4
3
2
THERMOSTAT
1
HOT WATER
3
2
1
HEATING
S YS TEM 2000
S YS TEM 2000
S YS TEM 2000
S YS TEM 2000
FACTORY WIRING
FIELD WIRING*
* Field Wiring terminated to input terminal A1 and to output terminal 24VAC
are to be wired into the open lugs provided on those terminal locations.
HW CIRC RELAY
HOT WATER TANK