background image

 
 
 
 
 

 
 

 
 
 

 
 
 
 
 
 
 

 

 

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Step 3   Open Front 

 

Completely remove cover nuts, 
washers and jacket screws at back, 
sides and top. 
With hands at top and bottom, pull 
cover 

and

 insulation board straight 

back as a single unit. 

 

2. 

Step 8 Zone controls 

 

Open/Close zone valves or operate zone circulators several 
times to see that they move freely. 

Step 9  Plate Heat Exchanger Maintenance 

 

1. 

 

Close the isolating ball valve located on the bypass circ flange, connect a drain hose to the hydronic bypass         
y-strainer, open flush valve, and flush into a bucket to remove debris.  Close flush valve, remove drain hose, open 
isolating ball valve on bypass circ flange, and confirm boiler pressure is adequate, adding makeup water if 
necessary.

 

3.  Open a fixture and wait until hot water is continuously flowing.  Turn the mixing valve up and down in temperature 

to ensure that it moves freely.  Set the mixing valve temperature feeding the domestic hot water fixtures to the 
desired temperature of approximately 120

°

F using mixing valve.  

 
Note: If the domestic water supply is “hard” with high mineral or lime content, clean and flush when necessary.  
Symptoms include poor hot water quality or low domestic hot water flow. See Hot Water Maintenance for 
mineral cleaning and flushing instructions.  Consider installing Scale Stopper (EK P/N: 10-0650) or water 
softener in hard water conditions so recurring plate heat exchanger cleaning will no longer be necessary in most 
circumstances.

 

Step 7  Check Burner 

 

6.  Check end cone through air tube opening with drawer assembly removed. 
7.  Check Fan/Air Inlet for dirt or lint. 
8.  Install drawer assembly and check ignitor. 
9. 

Check Filter condition.  Replace annually and if vacuum exceeds 7” for 
single pipe systems. 

10. 

Check flexible oil line for leaks or corrosion.  Gently bend hose along its 

length to check for hardening.  Replace immediately if any of these 
conditions are present. 

 

Step 6  Remove Drawer Assembly 

 

5.  Check Electrode Setting. 
6.  Check Porcelain Condition. 
7.  Check Nozzle for coking/heat. 
8.  Replace nozzle if necessary.  

See installation manual for nozzle selection.

 

 

Note: All burners require “Amulet” retention head protector.

 

Bypass Y-Strainer Flush Valve 

 

 

 

Shown with optional clean 

in place valves 

Reviews: