Accel CS Installation Instructions

   

Page 3

 

Energy Kinetics Inc. 

 51 Molasses Hill Rd. 

 Lebanon,  NJ 08833 

 800-323-2066 

 

www.energykinetics.com

 

X:\TechDocs\Installation_Manuals\AccelCS_Quick_Install_Guide\AccelCS Quick Install Guide 02-26-19.doc 

Hot Water Storage Tank Pump Wiring and Piping 

VENTING:

 

Refer to 

Owner and Installation Manual

 

WARNING:  Leak test all

 

gas connections 

including factory connections. 

Cold Water Make Up

 IN

 

OPTION SWITCHES:

  Refer to 

Owner and Installation Manual.

   

H   C 

 

Hot (Black) 

120 V 

Hot Water 

OUT

 

(Heat Trap Optional) 

A1 

T1 

T2 

T4 

Z3 

24 VAC 

 

 

A1 

 

Pigtail 

Boiler

 IN

 

Boiler 

OUT

 

Smart Pump to 
Domestic IN 

 Domestic OUT 

Neutral to an open 
120VAC neutral terminal 

Violet pigtail to120VAC 

DHW CIRC 

terminal 

Neutral  
(White) 

LINE VOLTAGE WIRING:

 The line voltage wiring is 

essentially complete in the wiring harness junction 
box.   

Connect 120 VAC power to pigtails provided. 

Outdoor Sensor: 

Install sensor on North side 
of dwelling with cable inlet 
facing down.

 

Install leads in Block J-8 
Positions 11 & 12 

22AWG/100   
f jk jk

hk k

j

i2 OR

Sola

24 VAC 
 
Pigtail 

T1, T2, T3, T4 

Z1, Z2, Z3, Z4 

Ground  

(Green) 

J-8

TIP

: Run the Smart Pump 

greenfield through the bottom of 
the Accel for a cleaner look and 
shorter wiring run. 

Option Switch 5 OFF: 

Max./min. boiler supply setting 160°F/120°F 

Option Switch 5 ON  : 

Max./min. boiler supply setting 180°F/140°F. 

Option Switch 4 ON  : 

Set Custom max./min. boiler supply temps

 

Option Switch 9 ON  : 

Indirect tank with coil (

OFF

: Plate Heat Exch)