Hot Water Storage Tank Pump Wiring and Piping
VENTING:
Refer to
Owner and Installation Manual
WARNING: Leak test all
gas connections
including factory connections.
Cold Water Make Up
IN
OPTION SWITCHES:
Refer to
Owner and Installation Manual.
H C
Hot (Black)
120 V
Hot Water
OUT
(Heat Trap Optional)
A1
T1
T2
T4
Z3
24 VAC
A1
Pigtail
Boiler
IN
Boiler
OUT
Smart Pump to
Domestic IN
Domestic OUT
Neutral to an open
120VAC neutral terminal
Violet pigtail to120VAC
DHW CIRC
terminal
Neutral
(White)
LINE VOLTAGE WIRING:
The line voltage wiring is
essentially complete in the wiring harness junction
box.
Connect 120 VAC power to pigtails provided.
Outdoor Sensor:
Install sensor on North side
of dwelling with cable inlet
facing down.
Install leads in Block J-8
Positions 11 & 12
22AWG/100
f jk jk
hk k
j
i2 OR
Sola
24 VAC
Pigtail
T1, T2, T3, T4
Z1, Z2, Z3, Z4
Ground
(Green)
J-8
TIP
: Run the Smart Pump
greenfield through the bottom of
the Accel for a cleaner look and
shorter wiring run.
Option Switch 5 OFF:
Max./min. boiler supply setting 160°F/120°F
Option Switch 5 ON :
Max./min. boiler supply setting 180°F/140°F.
Option Switch 4 ON :
Set Custom max./min. boiler supply temps
Option Switch 9 ON :
Indirect tank with coil (
OFF
: Plate Heat Exch)