background image

 

 

________________________________________________________________________________________________________ 

Energizer

 Solar Inverter | Installer Manual                                                                                              [3] 

 

 

 

 

Danger.

 Risk of electric shock! 

 

 

 

Danger to life due to high voltage. 

There is residual voltage in the inverter which needs 5 minutes 

to discharge. Wait 5 minutes before you open the upper lid or the DC lid. 

 

 

 

Read the manual. 

 

 

 

Product should not be disposed as household waste. 

2. Safety 

2.1  Appropriate Usage 

This inverter is designed and tested in accordance with international safety requirements. However, certain safety 

precautions must be taken when installing and operating this inverter. The installer must read and follow all instructions, 

cautions and warnings in this installation manual. 

All operations including transport, installation, start-up and maintenance, must be carried out by qualified, trained 

personnel. 

The electrical installation and maintenance of the inverter shall be conducted by a licensed electrician and must 

comply with local wiring rules and regulations. 

Before installation, check the unit to ensure it is free of any transport or handling damage, which could affect 

insulation integrity or safety clearances. Choose the installation location carefully and adhere to specified cooling 

requirements. Unauthorised removal of necessary protections, improper use, incorrect installation and operation 

may lead to serious safety and shock hazards or equipment damage. 

Before connecting the inverter to the power distribution grid, contact the local power distribution grid company to 

get appropriate approvals. This connection must be made only by qualified technical personnel. 

Do not install the equipment in adverse environmental conditions, such as in close proximity to flammable or 

explosive substances, in a corrosive environment, where there is exposure to extreme high or low temperatures, 

or where humidity is high. 

Do not use the equipment when the safety devices do not work or are disabled. 

Use personal protective equipment (PPE), including gloves and eye protection during the installation. 

Inform the manufacturer about non-standard installation conditions. 

Do not use the equipment if any operating anomalies are found. Avoid temporary repairs. 

All repairs should be carried out using only approved spare parts, which must be installed in accordance with 

their intended use and by a licensed contractor or authorised service representative. 

Liabilities arising from commercial components are delegated to their respective manufacturers. 

Any time the inverter has been disconnected from the public network, please be extremely cautious as some 

components can retain charge sufficient to create a shock hazard. Prior to touching any part of the inverter please 

ensure surfaces and equipment are under touch safe temperatures and voltage potentials before proceeding. 

2.2  PE Connection and Leakage Current 

PV System Residual Current Factors

 

Summary of Contents for Force 3.6S

Page 1: ...________________________________ Energizer Solar Inverter Installer Manual 0 INSTALLER MANUAL This guide describes how to use and install Energizer Solar Inverters To prevent improper operation before...

Page 2: ...3 4 Dimensions 6 4 Technical Data 7 4 1 DC Input 7 4 2 AC Output 7 4 3 Efficiency Protection and Standard 8 4 4 General Data 8 5 Installation 9 5 1 Packing List 9 5 2 Preparation 9 5 3 Installation S...

Page 3: ...echnicians only 1 3 Symbols Used The following types of safety instructions and general information that appear in this document are as described below Danger Danger indicates a hazardous situation wh...

Page 4: ...d operation may lead to serious safety and shock hazards or equipment damage Before connecting the inverter to the power distribution grid contact the local power distribution grid company to get appr...

Page 5: ...nts to limit the current in grounding conductors for the safety The default value for higher speed personal protection is 30mA and 300mA per unit for lower speed fire safety Installation and Selection...

Page 6: ...ter and the meter distribution system SPD test impulse D1 for signal line according to EN 61632 1 All DC cables should be installed to provide as short a run as possible and positive and negative cabl...

Page 7: ...minals Introduction Item Description A DC Connector B DC Connector C DC Switch Optional D Waterproof Lock Valve E Communication Port F USB Port For Upgrade G WiFi GPRS LAN Optional H AC Connector I Gr...

Page 8: ...Current input A input B A 15 15 MPPT Voltage Range Vdc 80 550 80 550 80 550 80 550 80 550 Start up Voltage V 120 120 120 120 120 No of MPP Trackers 2 2 2 2 2 Strings Per MPP Tracker 1 1 1 1 1 4 2 AC...

Page 9: ...lf Consumption night W 1W Monitoring Module optional External WIFI Lan GPRS optional Communication Meter CT DRM USB update RS485 Display LCD Panel Touch Key iOS App Android App Web Portal Warranty 10...

Page 10: ...up during installation and operation To avoid overheating always make sure the air flow around the inverter is not blocked Do not install in places where gas or flammable substances may be present Avo...

Page 11: ...t set 8mm Crimping pliers Stripping pliers Screwdriver 5 5 Installation Steps Step 1 Fix the bracket on the wall Choose the wall location you want to install the inverter Place the bracket on the wall...

Page 12: ...strings of PV modules Please select suitable PV modules with high reliability and quality Open circuit voltage of module array connected should be less than 600V and operating voltage should be withi...

Page 13: ...d ensure all conductor strands are captured in the pin contact Crimp pin contact by using a crimping plier Put the pin contact with striped cable into the corresponding crimping pliers and crimp the c...

Page 14: ...tion device is referred to the table above any load SHOULD NOT be connected with the inverter directly Step 3 AC Wiring Check the grid voltage and compare with the permitted voltage range refer to tec...

Page 15: ...e bayonet out of the slot with a small screwdriver or the unlock tool and pull it out or unscrew the threaded sleeve then pull it out 5 7 Earth Connection Screw the ground screw with screwdriver as sh...

Page 16: ...iFi GPRS port at the bottom of the inverter 4 For WiFi device Connect the WiFi with the local router and complete the WiFi configuration please refer to the WiFi product manual for more details 5 Set...

Page 17: ...g devices Meter optional The inverter has integrated export limitation functionality To use this function a power meter or a CT must be installed For Meter installation please install it on the grid s...

Page 18: ...se refer to following steps a Please contact our service support team to get the latest firmware and copy the files to U disk using the following file path Master Update master xxxxx_Master_Vx xx hex...

Page 19: ...fault code Isolation fault will be displayed on the inverter screen and the RED LED indicator will light up Reactive Power Regulation for Voltage Variation Volt VAr Mode Details of how to enable this...

Page 20: ...possible inverter states indicating that the inverter has started up successfully Waiting Inverter is waiting to check the DC input voltage from panels is greater than 80V lowest start up voltage but...

Page 21: ...Inverter Switch Off Please follow the below steps to switch off the inverter a Switch off the inverter AC isolation switch b Switch off the DC isolation switch and allow 5 minutes for the inverter to...

Page 22: ...________________________________________________________________________________________________________ Energizer Solar Inverter Installer Manual 21 6 2 Function Tree...

Page 23: ...V with DC After the LCD switches off reconnect and check again EEPROM Fault Disconnect PV PV with DC After the LCD switches off reconnect and check again GFC Fault Disconnect DC and AC connector check...

Page 24: ...OCP Turn off the PV and grid reconnect them PLL Fault System will reconnect if the utility is back to normal PV OVP Check the panel s open circuit voltage whether the value is similar or already 550Vd...

Page 25: ...dy including a description of your system installation the model and serial number and any issues and troubleshooting you have already attempted 7 3 Routine Maintenance Safety check A safety check sho...

Page 26: ...ckaging If it is no longer available you can use an equivalent box that meets the following requirements Suitable for loads more than 30 kg Contains a handle Can be fully closed 8 3 Storage and Transp...

Page 27: ...Email hello energizersolar com Website www energizersolar com 2021 Energizer Energizer and certain graphic designs are trademarks of Energizer Brands LLC and related subsidiaries and are used under li...

Reviews: