background image

10 

 

Customizable Operation Settings

 

 
 

Customizing settings for normal operation are covered on this page. 

 

 
 

1.  From the START CYCLE home screen, press USER SETTINGS button 

 

2.  The COUNTDOWN TIMER / CYCLE TIMER screen is displayed and may be used to 

modify system variables as follows: 

 

Countdown Timer

– control for time delay from when Start Cycle button is pressed to 

when system lamps come on 
 

Cycle Timer

 

– control for duration of cycle operation 

 

3.  After adjusting to preferred settings, press HOME button to return to Start Cycle  

 

4.  Press START CYCLE button to begin customized treatment cycle 

Summary of Contents for UV-MAX

Page 1: ...infection System Table of Contents Page 1 Energenics UV MAX Page 2 Advisories Purpose Contents Page 3 UV MAX Safe Operation Procedure Page 4 Safety Guidelines Page 5 System Description Page 6 System Delivery Page 7 Operation Overview Page 8 Operation Settings Default Page 9 Operation Settings Customizable Page 10 Cycle Stop Status Screens Page 11 System Care Page 12 Troubleshooting Page 13 ...

Page 2: ...2 ...

Page 3: ...e system center Contents This manual will serve as your reference guide for installation operation and service of your UV MAX system Reference to all parts warranty and support are included This manual covers the system equipment products listed below o Energenics UV MAX Safety Observation It is required for the person s responsible for the installation of this equipment operators of this equipmen...

Page 4: ...nect UV MAX to 120vac plug receptacle 4 Press start on UV MAX control and exit treatment area 5 Adhere to recommended safety precautions to avoid potential injury or blindness Safety 1 You should never look directly at a UV lamp in operation 2 The space should be vacant and closed prior to UV MAX operation 3 Never command the system on when the treatment space is occupied ...

Page 5: ...obable personnel should wear PPE providing full coverage of exposed skin and appropriate eye protection UV safety glasses designed to filter UV C and those of the wrap around type are recommended Be aware not all glasses offer complete coverage or UV C filtering OSHA Guidelines for Ultraviolet Exposure OSHA provides technical guidance regarding protecting employees from ultraviolet light with resp...

Page 6: ...output to footprintserved o Rugged design build o Ease of use controls o User safety protection INDUSTRIAL STRENGTH FRAME AND STRUCTURE CORROSION PROOF CONSTRUCTION 6 INDUSTRIAL CASTORS HIGH OUTPUT PRE HEAT LAMPS FOR LONG RUN TIME LENGTH MOTION HEAT DETECTION SAFETY SHUTOFF INDIVIDUAL LAMP FAILURE INDICATORS EMERGENCY STOP BUTTON BUILT TO IP58 WATER AND DUST STANDARDS ...

Page 7: ...following procedure 1 Unpack your new system and stand upright 2 Inspect fully for damage If damage present contact Energenics prior to use 800 944 1711 3 Verify secure lamp installation 4 Plug in system power cord 5 Power on the unit Your Energenics UV MAX system is now ready for operation See Operation Overview ...

Page 8: ...Cycle state 4 Turn on system 5 Evacuate space Audio and Visual Indicators 1 Audio Alarm a Once Started Short warning beeps increasing in frequency b During Process Long stroke beeps c Process Complete Three short beeps no beepthereafter 2 Visual Indicator a Red Light Warning get out process running b Green Light Safe Process complete 3 Display of System a Operations b Controls c Indication of Syst...

Page 9: ... Lamps shall be clean c System frame shall be in good condition d Display of system shall be clean 2 Plug in system power cord 3 Ensure all personnel are out of treatment area 4 Operate system a Press START CYCLE b The system will enter countdown mode 1 min c Once the process is complete control panel will display cycle status d Press RESTART CYCLE to return to home screen ...

Page 10: ...CLE TIMER screen is displayed and may be used to modify system variables as follows Countdown Timer control for time delay from when Start Cycle button is pressed to when system lamps come on Cycle Timer control for duration of cycle operation 3 After adjusting to preferred settings press HOME button to return to Start Cycle 4 Press START CYCLE button to begin customized treatment cycle ...

Page 11: ...een 2 Release Emergency Stop by pulling up on the red knob 3 Select HOME button to return to main screen 4 Press START CYCLE to resume normal operation of system System Faults Should cycle deactivation occur by means of a system fault the following method will be required to reset the system 1 Observe the fault status type on the control panel 2 Ensure all system faults have been properly addresse...

Page 12: ... recommended to test system performance using an ATP meter Bi Annual 1 Inspect the system interior and exterior lamp for clean conditions 2 Clean as needed 3 It is recommended to test system performance using an ATP meter Service Machine Message 1 Every 8 running hours it is recommended that lamps be wiped down with isopropyl or rubbing alcohol This will remove any debris that may have accumulated...

Page 13: ...y the start cycle button is pressed A Inspect the lamp for age or physicalfailure A Contact Energenics Support for further information Q My system is running fine how do I verify the lamp output is correct A The system has a status screen at the end of the cycle A Faults will indicate if the system is not performing correctly Q The touchscreen has presented a flashing Service Machine icon What doe...

Reviews: