
Section
18677 Rev. A 8/05
FIGURE 7: Mounting Flange / Tube Detail
1) Insert tube 06413 into front
casting to point (A).
2) Tighten set screws marked (B)
until snug.
3) After both set srews are sung,
turn each additional 1/4 turn to
secure tube in place.
FIGURE 8: Burner Box / Transition Tube Detail
20
Installation & Assembly
Section 4
Summary of Contents for HEATSTAR enerRADIANT ERXL-100
Page 2: ...Section 18677 Rev A 8 05...
Page 37: ...Section 18677 Rev A 8 05 Troubleshooting Guide Ener Radiant XL 35 Operation Maintenance 8...
Page 38: ...Section 18677 Rev A 8 05 36 Operation Maintenance Section 8...
Page 40: ...Section 18677 Rev A 8 05 FIGURE 24 Ener Radiant XL Burner Control Housing 38 Appendices 9...
Page 43: ...Section 18677 Rev A 8 05...