background image

12 

Turn on the DC power, and check if power supply indicator of power 1 or power 1 
turns  on,  which  means  the  main  power  (Power  1)  or  backup  power  (Power  2)  is 
connected correctly. 

CAUTION

 

For better transmission performance, it is recommended to use Cat5 or better 
cables to connect the switch and powered devices. 

For better protection performance, it is recommended always to make the ground 
connection first and disconnect it at the end when operating the unit. 

Power  on  the  system  only  after  confirming  that  the  wiring  is  correct,  to  avoid 
damage to the equipment. 

Read the user manual carefully before operating or maintaining the repeater to 
avoid misoperation. 

The installation steps are finished. 

Summary of Contents for IAM-5SE1016IMA

Page 1: ...Quick Installation Guide Gigabit Switch Managed Layer 3 PoE SFP 10G Industrie Design IAM 6SE1008IMA IAM 5SE1016IMA EN...

Page 2: ...images shown here are indicative only If there is inconsistency between the image and the actual product the actual product shall govern Symbol Conventions The symbols that may be found in this docum...

Page 3: ...t 1 Product Introduction 2 2 1 Overview 2 2 2 Hardware Introduction 2 3 1 Safety Precaution 6 3 2 Insatallation Steps 8 3 2 1 DIN rail Installation 9 3 2 2 Wall mounted Installation 10 3 2 3 DC Power...

Page 4: ...d carefully unpack it The box should contain the following items Please check before installation if any missing please contact your dealer immediately No Items Quantity 1 Switch 1 pcs 2 Mounting Acce...

Page 5: ...nooping QoS RSTP Fast Ring or Layer 3 routing It can be easily managed via a WEB GUI http https CLI telnet ssh console or SNMP The switch is designed for a wide operating temperature range from 40 to...

Page 6: ...Indicators Instructions Indicators Status Descriptions PWR1 DC Power Supply Indicator Main On The main power supply is working Off The main power supply is off PWR2 DC Power Supply Indicator Backup O...

Page 7: ...t power supply port of the switch adopts 2 pcs removable 4 position terminal blocks The electrical performance are as follows Specifications Descriptions Wire range 22 14 AWG 2 5mm Torque 0 4Nm 3 5 Lb...

Page 8: ...plying PoE In this case the port PoE indicator is off please check the PoE function Console Port The device contains a serial RS 232 interface as the console port for local management interface For th...

Page 9: ...d immediately to the person in charge Ground For better protection performance it is recommended as follows Do not damage the ground conductor or operate the device in the absence of well installed gr...

Page 10: ...erate the equipment under or near the water source such as the sink laundry room or other high humidity areas It is forbidden to touch the device with wet hands Dust Proof Install the equipment far aw...

Page 11: ...tallation Steps This series switches support 2 installation methods DIN rail installation Wall mounted installation Following with the dimensions of the switches and its insatallation accessories Dime...

Page 12: ...9 3 2 1 DIN rail Installation Please follow the steps below Step 1 Fix the DIN rail hanger to the switch Accessories 1 3 Step 2 Install the switch to the DIN rail Accessories Null...

Page 13: ...teps below Step 1 Fix the hangers to the switch Accessories 2 4 Step 2 Drill 4 holes on the wall where device is installed the diameter of the holes and distances between them are suggested as the fig...

Page 14: ...the power supply Connect one end of the protective grounding cable to the grounding screw on the side panel of the device and the other end is well grounded nearby Connect the positive and negative wi...

Page 15: ...5 or better cables to connect the switch and powered devices For better protection performance it is recommended always to make the ground connection first and disconnect it at the end when operating...

Page 16: ...Switch Property Standards IEEE 802 3 IEEE 802 3u IEEE 802 3ab IEEE 802 3z IEEE 802 3x IEEE 802 1Q IEEE 802 1p IEEE 802 3ad IEEE 802 1D IEEE 802 1x Switch Architecture Store and Forward Packet Buffer 1...

Page 17: ...ors 2 power supply indicators 1 system working indicator 1 alarm indicator Init Button Short press to restart Long press 5s to initialize the system Dimension W D H 163mm 110mm 95 6mm Gross Weight 190...

Page 18: ......

Page 19: ......

Page 20: ...ribution through specialised trade channels only VIDEOR E Hartig GmbH Carl Zeiss Stra e 8 63322 R dermark Germany Tel 49 0 6074 888 0 Fax 49 0 6074 888 100 www videor com www eneo security com Technic...