Endura DAS5200 Series Installation Manuallines Download Page 7

C2670M

C

  

 

Page

 

7

 

GROUNDING 

A

 

properly

 

grounded

 

installation

 

is

 

critical

 

in

 

ensuring

 

the

 

fault

free

 

operation

 

of

 

Endura

 

equipment.

 

All

 

conduit

 

used

 

should

 

be

 

securely

 

connected

 

rigid

 

metal.

 

An

 

earth

ground

 

connection

 

should

 

be

 

made

 

by

 

one

 

of

 

the

 

following

 

means:

 

 

Grounding

 

rod

 

 

Building

 

steel

 

 

Conductive

 

cold

 

water

 

service

 

pipe

 

All

 

power

 

panels

 

should

 

be

 

grounded

 

to

 

the

 

electrical

 

service

 

entrance.

 

The

 

ground

 

connections

 

that

 

will

 

be

 

used

 

throughout

 

the

 

server

 

room

 

should

 

be

 

tested

 

to

 

ensure

 

a

 

low

 

resistance

 

path

 

to

 

ground.

 

NOTE:

  

Be

 

sure

 

to

 

verify

 

that

 

there

 

is

 

no

 

direct

 

current

 

(DC)

 

potential

 

between

 

grounds

 

of

 

different

 

circuits

 

in

 

each

 

rack.

 

Any

 

reading

 

above

 

1

 

V

 

measured

 

between

 

grounds

 

should

 

be

 

considered

 

a

 

problem

 

and

 

investigated.

 

 

Grounding

 

Guidelines

 

 

Main

 

building

 

electrical

 

ground:

 

The

 

main

 

electrical

 

service

 

entrance

 

equipment

 

should

 

have

 

an

 

earth

ground

 

connection

 

as

 

required

 

by

 

applicable

 

codes.

  

Connections

 

such

 

as

 

grounding

 

rod,

 

building

 

steel,

 

or

 

a

 

conductive

type

 

cold

 

water

 

service

 

pipe

 

provide

 

an

 

earth

ground.

 

 

Electrical

 

conduit

 

ground:

 

All

 

electrical

 

conduits

 

should

 

be

 

made

 

of

 

rigid

 

metallic

 

conduit

 

that

 

is

 

securely

 

connected

 

together

 

or

 

bonded

 

to

 

panels

 

and

 

electrical

 

boxes

 

to

 

provide

 

a

 

continuous

 

grounding

 

system.

 

 

Power

 

panel

 

ground:

 

Each

 

power

 

panel

 

should

 

be

 

grounded

 

to

 

the

 

electrical

 

service

 

entrance

 

with

 

green

 

(green/yellow)

 

wire

 

ground

 

conductors.

  

The

 

green

 

(green/yellow)

 

wire

 

ground

 

conductors

 

should

 

be

 

sized

 

per

 

applicable

 

codes.

 

Summary of Contents for DAS5200 Series

Page 1: ...IP Video Surveillance System Installation Guidelines for Endura Equipment C2670M C 9 09...

Page 2: ...POWER QUALITY 5 GROUNDING 7 ELECTROSTATIC DISCHARGE PREVENTION 8 ENVIRONMENTAL GUILDELINES 9 ENVIRONMENTAL ELEMENTS 9 OPERATING TEMPERATURE 10 HEATING VENTILATION and AIR CONDITIONING HVAC 12 NETWORKI...

Page 3: ...be used for all servers As hard disk drive reliability is negatively impacted by temperature extremes care must be taken to ensure that hard disk drives are never exposed to elevated operating temper...

Page 4: ...r Endura equipment Consult applicable regulations and standards for determining the proper wire gauge to use Generally you should install circuit breakers that are rated at 125 percent of the expected...

Page 5: ...tage or overvoltage for up to a few nanoseconds Under voltage brownout Low line voltages for an extended period of time NOTE If these issues are suspected or known to occur for a given site ensure tha...

Page 6: ...alculate the UPS size required for an installation with two NSM5200s connected to the same UPS Example Two NSM5200s are to be connected to the same UPS From Table A each NSM5200 dissipates 262 W of po...

Page 7: ...in each rack Any reading above 1 V measured between grounds should be considered a problem and investigated Grounding Guidelines Main building electrical ground The main electrical service entrance eq...

Page 8: ...500 V 14 800 V Source B A Unger Electrostatic Discharge Failures of Semiconductor Devices Bell Laboratories 1981 For the same relative humidity level a high rate of airflow produces higher static char...

Page 9: ...ees working in the room SITE CLEANLINESS It is critical that the installation site be completely clean and devoid of dust and debris created during the construction process Operation of the equipment...

Page 10: ...ne an extensive amount of design and engineering to keep the operating temperature of internal components as close to the ambient temperature of the room as possible As such maintaining the right ambi...

Page 11: ...rflow 274 Video Encoder NET5308T EXP 50 to 95 F 10 to 35 C Front to rear airflow 137 Video Encoder ENC5308 50 to 95 F 10 to 35 C Front to rear airflow 137 Video Encoder ENC5316 50 to 95 F 10 to 35 C F...

Page 12: ...ool air in through the front of the unit and exhaust heated air out of the back of the unit The ideal server room configuration utilizes cold and hot aisles HVAC vents placed either in the floor or th...

Page 13: ...t Endura Design Certification and collaborates with select switch vendors If additional assistance is required Pelco offers professional services for the Endura certified integrator CABLING All networ...

Page 14: ...e system manager is built upon a standard server platform it will suffer drift over time To maintain an accurate time for the entire system Pelco recommends pointing the Endura system to either the NT...

Page 15: ...ailable 100 percent of the time and the environmental conditions of the equipment location must be maintained within specification WARNING If either conditioned power or the environmental conditions o...

Page 16: ...n factors that may be helpful in determining those factors required for site planning Refrigeration 1 W 0 86 kcal h 1 W 3 412 BTU H 1 W 2 843 x 10 4 tons 1 ton 200 BTU minute 1 ton 12 000 BTU H 1 ton...

Page 17: ...party or product liability relating to the Products shall not exceed the price paid by the Dealer to Pelco for such Products In no event will Pelco be liable for any special incidental or consequenti...

Page 18: ...Pelco Inc Worldwide Headquarters 3500 Pelco Way Clovis California 93612 USA USA Canada Tel 800 289 9100 Fax 800 289 9150 International Tel 1 559 292 1981 Fax 1 559 348 1120 www pelco com...