Commissioning
RIA16
22
Hauser
8
Commissioning
8.1
Function check
Make sure all connected wires are secure.
To ensure correct functioning, the screws of the terminals must be tightened. The device is now
operational.
During device initialization, all the segments are shown on the display for approx. 1 second.
"
Caution!
Prior to commissioning, the screw cap must be tightened and secured with the cover clamp. Any
openings not used must be sealed.