Commissioning
Proline 200 FOUNDATION Fieldbus
26
Hauser
• "Post-installation check" checklist→ 11
• "Post-connection check" checklist → 19
8.2
Switching on the measuring device
‣
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to the
Operating Instructions for the device → 2
8.3
Setting the operating language
Factory setting: English or ordered local language
X X X X
X X X
X
X
20.50
Operation
Setup
Main menu
0104-1
Display language
English
Español
Français
Display language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Display language
English
Deutsch
0104-1
Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
XX
XX
1.
2.
3.
4.
A0029420
3
Taking the example of the local display