SmarTec S CLD 132 PROFIBUS-PA/-DP
Commissioning
40
EHauser
6
Commissioning
6.1
Function check
Caution!
•
Before power-up, check all the connections again for correctness.
•
Also ensure that the post-connection check (Chap. 4.2) has been performed.
Warning!
•
Before power-up, make sure there is no danger to the measuring point. Uncontrolled
actuated pumps, valves or similar could lead to damage to instruments.
6.2
Setting the device address
The address must always be set in the case of a PROFIBUS device. The process control
system does not recognise the transmitter if the address is not set correctly.
All devices have the address 126 on leaving the factory. You can use this address for
device function checking and for connecting to a PROFIBUS-PA network. You must
change this address to be able to integrate additional devices.
The device address can be set via:
•
Local operation,
•
The PROFIBUS service Set_Slave_Add or
•
The DIL switch in the device.
Note!
•
Valid device addresses are in the range 0... 125.
•
No cyclic data exchange takes place with addresses over 126!
•
Each address may only be given once in a PROFIBUS network.
•
The double arrow in the display indicates active communication with PROFIBUS.
Position of the DIL switch
C07-CLD132xx-09-06-03-xx-002
}° £{\Ê *ÃÌÊvÊÌ iÊÊÃÜÌV ÊÊÌ iÊ->À/iVÊ-ÊÊ£ÎÓÊÌÀ>ÃÌÌiÀÊÞÊ>VViÃÃLiÊÜ iÊÌ iÊ ÕÃ}Ê
VÛiÀÊÃÊ«i®°
Summary of Contents for PROFIBUS-DP
Page 2: ......