Oxymax COS22D
Safety instructions
Hauser
5
1.2
Installation, commissioning and operation
Please note the following items:
• Installation, commissioning, operation and maintenance of the measuring system must only be
carried out by trained technical personnel.
Trained personnel must be authorized for the specified activities by the system operator.
• Electrical connection must only be carried out by a certified electrician.
• Technical personnel must have read and understood these Operating Instructions and must adhere
to them.
• Before commissioning the entire measuring point, check all the connections. Ensure that electrical
cables and hose connections are not damaged.
• Do not operate damaged products and secure them against unintentional commissioning. Mark the
damaged product as being defective.
• Measuring point faults may only be rectified by authorized and specially trained personnel.
• If faults can not be rectified, the products must be taken out of service and secured against
unintentional commissioning.
• Repairs not described in these Operating Instructions may only be carried out at the manufacturer’s
or by the service organization.
1.3
Operational safety
The sensor has been designed and tested according to the state of the art and left the factory in perfect
functioning order.
Relevant regulations and European standards have been met.
As the user, you are responsible for complying with the following safety conditions:
• Installation instructions
• Local prevailing standards and regulations.
Summary of Contents for Oxymax COS22D
Page 1: ...BA00447C 07 EN 02 12 71153853 Operating Instructions Oxymax COS22D Dissolved oxygen sensor...
Page 7: ...Oxymax COS22D Identification Endress Hauser 7 a0014925 Fig 1 EC declaration of conformity...
Page 16: ...Wiring Oxymax COS22D 16 Endress Hauser a0010056 Fig 8 Connection in hazardous locations...
Page 40: ...BA00447C 07 EN 02 12 FM9...