Liquiline System CA80TN
Commissioning
Hauser
39
9
Commissioning
Before the supply voltage is applied
On account of the device design, high switch-on currents occur when the device is
commissioned at low temperatures. The power value indicated on the nameplate refers to
the power consumption after one minute of operation when the device is commissioned at
5 °C (41 °F).
Activities while the analyzer is in operation
Risk of injury and infection from medium!
‣
Before you release any hoses, make sure that no actions, such as the pumping of
sample, are currently running or are due to start shortly.
‣
Wear protective clothing, goggles and gloves or take other suitable measures to protect
yourself.
‣
Wipe up any spilt reagent with a disposable tissue and rinse with clear water. Then dry
the cleaned areas with a cloth.
9.1
Preliminaries
9.1.1
Commissioning steps
1. Connect the liquid-bearing hose of the sample supply system.→ 40
2. Optional (CA80TN-**S6/S7 versions only): connect the dilution water. Minimum
quality: deionized water (demineralized water).
3. Check that the hoses are mounted correctly in the hose glands. It should not be
possible to remove the hoses without the application of force.
4. Visually inspect all the hose connections to ensure everything is correct. Use the hose
connection diagram→ 39.
5. Insert the bottles and make the most important menu settings.→ 42
6. Start commissioning via the menu.→ 43
9.1.2
Hose connection diagram
A0041298
49
Hose connection diagram
The diagrams below reflect the status at the
time of issue of this documentation. The
hose connection diagram that applies for
your device version is provided on the inside
of the door of the analyzer.
‣
Only connect the hoses as specified in
this diagram.
Summary of Contents for Liquiline System CA80TN
Page 2: ......
Page 162: ...www addresses endress com 71593684 71593684 ...