Commissioning
Liquicap M FTI51, FTI52
56
Hauser
6
Commissioning
6.1
Installation and function check
Make sure that the post-installation check and final check have been completed before you start
your measuring point:
• For the "Post-installation" checklist, refer to Page 41.
• For the "Post-connection" checklist, refer to Page 52.
6.2
Commissioning the electronic inserts
FEI51, FEI52, FEI54, FEI55
This chapter describes the process for commissioning the device with electronic insert versions
FEI51, FEI52, FEI54, FEI55.
!
Note!
• When you start up the device for the first time, the output is in safe status.
This is signaled by the flashing yellow LED 6.
• The device is not operational until you have carried out a calibration.
To attain maximum operational safety, carry out an empty and a full calibration. This is
particularly recommended for critical applications.
Refer to the following subchapters for information on how to carry out the calibration.
6.2.1
Basic settings: overview
BA381Fen027
(optional)
Operation
Carrying out
empty calibration
chapter 6.2.3
Setting the measuring range, chapter 6.2.2
Carrying out
full calibration
chapter 6.2.4
Carrying out empty
and full calibration
chapter 6.2.5
Carrying out switch
point adjustment
chapter 6.2.7
Carrying out switch
point adjustment
chapter 6.2.7
Reset calibration, two-point control, build-up mode
witching delay, s
MIN-/MAX failsafe mode,
SIL mode, measuring range
p-/download sensor DAT,
restore factory setting
chapter 6.2.x
,
s
elf-test,
, u