Installation
Proline Promass 80
12
Hauser
3
Installation
3.1
Incoming acceptance, transport and storage
3.1.1
Incoming acceptance
On receipt of the goods, check the following points:
• Check the packaging and the contents for damage.
• Check that nothing is missing from the shipment and that the scope of supply matches your order.
3.1.2
Transport
The following instructions apply to unpacking and to transporting the device to its final location:
• Transport the devices in the containers in which they are delivered.
• The covers or caps fitted to the process connections prevent mechanical damage to the sealing
faces and the ingress of foreign matter to the measuring tube during transportation and storage.
Consequently, do not remove these covers or caps until immediately before installation.
• Do not lift measuring devices of nominal diameters > DN 40 (1 ½ ") by the transmitter housing
or the connection housing in the case of the remote version (
4). - Use webbing slings slung
round the two process connections. Do not use chains, as they could damage the housing.
#
Warning!
Risk of injury if the measuring device slips.
The center of gravity of the assembled measuring device might be higher than the points around
which the slings are slung. At all times, therefore, make sure that the device does not unexpectedly
turn around its axis or slip.
a0004294
Fig. 4:
Instructions for transporting sensors with > DN 40 (1 ½")