Cerabar PMC11, PMC21, PMP11, PMP21
Hauser
5
Documentation
The document types listed are available:
In the Download Area of the Hauser Internet site: www.endress.com → Download
Brief Operating Instructions (KA): getting the 1st measured value quickly
These instructions contain all the essential information from incoming acceptance to initial
commissioning.
Operating Instructions (BA): your comprehensive reference
These Operating Instructions contain all the information that is required in various phases of the life
cycle of the device: from product identification, incoming acceptance and storage, to mounting,
connection, operation and commissioning through to troubleshooting, maintenance and disposal.
Safety Instructions (XA)
Depending on the approval, the following Safety Instructions (XA) are supplied with the device. They
are an integral part of the Operating Instructions.
Device
Directive
Documentation
Option
PMP21
ATEX II 1/2G Ex ia IIC T4 Ga/Gb
XA01271P
BA
PMC21
ATEX II 2G Ex ia IIC T4 Gb
XA01271P
BB
PMC21
PMP21
ATEX II 3G Ex ec IIC T4 Gc
XA01533P
BC
PMC21
PMP21
FM IS Cl. I, Div.1 Gr. A-D T4
XA01321P
FA
PMC21
PMP21
CSA C/US IS Cl. I Div. 1 Gr. A-D
XA01322P
CB
PMC21
PMP21
EAC Ex ia IIC T4 Ga/Gb
XA01540P
GA
PMC21
PMP21
IEC Ex ia IIC T4 Ga/Gb
XA01271P
IA
PMC21
PMP21
NEPSI Ex ia IIC T4
XA01363P
NA
PMC21
PMP21
TIIS Ex ia IIC T4
In preparation
TA
1)
Product Configurator order code for "Approval"
The nameplate indicates the Safety Instructions (XA) that are relevant to the device.