
qTOWER³ / qTOWER³ G
Installation
19
Electrical connection require-
ments
Operating voltage
100 / 115 / 230 V (AC)
Line frequency
50 to 60 Hz
Power consumption
≤ 850 W
Device fuse
2 x 10 AT / 250 V
5.2
Installation
WARNING
Risk of electric shock!
Check that the mains connection conditions match those indicated on the type plate on
the rear of the device.
Before connecting the device to the mains network set the correct operating voltage at
the voltage switch on the underside of the device.
NOTICE
Unsuitable packaging material may cause damage to the device! Keep the original pack-
aging and transport lock for subsequent transports.
The following steps are required during the installation of the device:
¡
Installing the color module (if not already installed)
¡
Checking the set operating voltage and correcting it if it does not match the voltage
supplied at the site
¡
Connecting the device to the mains and the PC
¡
Installing software on the PC
}
Remove the device, the connection cables and the operating manual with the instal-
lation CD or USB stick from the transport packaging. Wait until the device has
reached room temperature for commissioning.
}
Verify that the delivery is complete. Check the device and accessories for transport
damage.
In the event of an incomplete delivery or transport damage, please contact Analytik
Jena.
}
Install the color modules if these are not already installed (→ "Installing color mod-
ules"
}
Set the operating voltage:
– Place the device on its side. Remove the cover from the voltage selection switch
on the bottom.
– Adjust the switch using a screwdriver or a coin so that the arrow points in the di-
rection of the mains voltage available on site.
– Replace the cover on the selection switch and put the device back on its feet.