Maintenance and care
multi N/C pharma HT
78
Measuring gas drying and cleaning
Maintenance interval
Maintenance task
Daily
¡
Check the filling of the halogen trap.
¡
When half of the copper wool or the brass wool is discol-
ored, replace the filling.
Quarterly
¡
Check the TIC condensate container and the condensation
coil for cracks and damage.
Every 6 months
¡
Replace the water traps on the front and on the gas box.
Every 12 months
¡
Clean the TIC condensate container and the condensation
coil (or earlier if necessary).
Integrated Swab Test solids module
Maintenance interval
Maintenance task
Quarterly
¡
Check the combustion tube for cracks and damage.
¡
Check the furnace lock for leaks.
Every 12 months
¡
Clean the combustion tube (earlier if required)
When necessary
¡
After software notification at the latest: Check the catalyst.
Replace as necessary.
¡
Replace a worn sealing ring of the lock.
Chemiluminescence detector (CLD)
Maintenance interval
Maintenance task
Every 12 months
¡
Replace the adsorber cartridge.
6.2
Adjustment and setting
6.2.1
General notes for adjusting the autosampler
During adjustment, the canulas are adjusted to the sample tray for optimum immersion
in the sample vessels and/or wash cups.
An adjustment of the autosampler is necessary:
¡
Before the first start
¡
After each change of the sample tray
¡
During recommissioning after transport or storage
Adjustment of the AS 10e and AS 21hp autosamplers is described under Installation and
Commissioning.
See also
2