multi EA 4000
Maintenance and care
123
4.
Pull the sealing elements and
the white union nut off the
worn pump hose.
5.
Slide the sealing elements onto
the new pump hose in the se-
quence shown.
Figure 49 Clamping the pump hoses
1 Phosphoric acid bottle
2 Stopper at the pump hose
3 Hose cartridge
4 Hose connection at the TIC reactor
6.
Clamp the pump hose between the two plastic stoppers (2 in Figure 49) in the
hose cartridge.
7.
Insert the hose cartridge into the pump and allow it to engage.
8.
Screw the pump hose to the TIC reactor.
NOTICE! The TIC reactor can get hot. Install the pump hose so that it does not
touch the hot reactor.
9.
Place the acid container in the drip tray onto the TIC module. Push the other end of
the pump hose into an opening of the acid container.
Inspect the pump hose for leaks every three months. Replace the pump hose as re-
quired, but at least annually.
Condensate pump
Summary of Contents for Analytik Jena multi EA 4000
Page 1: ...Operating Manual multi EA 4000 Elementary analyzer C S and Cl solids analysis...
Page 50: ...Commissioning multi EA 4000 50 Figure 32 multi EA 4000 C S Hose diagram...
Page 52: ...Commissioning multi EA 4000 52 Figure 33 multi EA 4000 Cl Hose diagram...
Page 54: ...Commissioning multi EA 4000 54 Figure 34 multi EA C S Cl for C S measurements Hose diagrams...
Page 55: ...multi EA 4000 Commissioning 55 Figure 35 multi EA 4000 C S Cl for Cl measurements...
Page 57: ...multi EA 4000 Commissioning 57 Figure 36 Automatic TIC solids module Hose diagrams...
Page 58: ...Commissioning multi EA 4000 58 Figure 37 multi EA 4000 C S with automatic TIC solids module...
Page 61: ...multi EA 4000 Commissioning 61 Figure 39 multi EA 4000 C S Cl with man TIC solids module...