3.3.10  When installing a BHE with 50 mm displacement in a vertically downward borehole, settlement is 

expected and setting range specified may be – 10/+ 40 mm. In such a case connecting rod end 
distance from guide plate top (6) should be set at (45 – 15) i.e. 30 mm. 

NOTE: 

If readout unit shows negative displacement reading, movement of structure is away from 
borehole face and vice versa.  

3.3.11  Re-assemble adopter cum guide plate (6) with grub (8.a) and (8.b) taking care that holes marked 

‘1’ ‘G’ and ‘V’ are aligned in reference plate (14), adopter cum guide plate (6) and flange housing 
(5). 

3.3.12  Tighten hollow bolts (12) with spanner size 21 mm and long hollow bolt (12) to firmly grip nylon 

tube but not to squeeze or hinder free movement of female end connector inside the nylon tube. 

NOTE: 

In upward to horizontally sloping borehole, tighten hollow bolts (12) particularly carefully as 
grout may leak through into the reference head assembly during the grouting process.  

NOTE: 

Take care that extensometer assembly does not drop into borehole

 

accidentally. It is 

advisable to secure it properly by attaching a safety rope to the anchor. 

3.3.13  Wrap rags or jute cloth strips soaked in quick setting cement water mix outside flanged housing 

(5) to build up approximately 5 mm thick layer. Lift and insert housing in borehole using a to and 
fro screwing motion sealing the annular space between housing and borehole.  

3.3.14  Fix expandable anchors (21) in holes drilled earlier for securing flanged housing with the M12 nuts 

and washers provided. Give enough time to let flanged housing set in borehole. 

3.3.15  Connect grout pipe to grouting machine or pump, grout till the entire cavity is filled and grout flows 

out of air vent pipe. Be very careful that grout flowing out of air vent tube does not get into the 
flanged housing and makes the installation messy.  

3.3.16  Pump clean water through the grout tube till clear water comes out of air vent tube. This will keep 

the grout tube clean for topping up the grout later on. 

NOTE:

          Give sufficient time for grout to set. 

CAUTION: 

Clean up grout and air vent tubes with clean water after grouting operation is complete as in 
§ 3.3.16 above 

NOTE: 

Check Engineer for cement water proportion to be used in grout. Composition of grout to be 
used depends upon site conditions. In case of hard rock, 50 kg of cement with 30 kg of water 
has been successfully used at some project sites. 

NOTE: 

Grout should cover anchor closest to the mouth or be around 1 m from the face of borehole 
whichever distance is less. This can be checked by inserting a 

φ

 3 mm wire into borehole 

through vent pipe. 

CAUTION: 

Please ensure that no grout overflows into the flanged housing. In case it overflows, it may 
get into the protective nylon tubing and jam the setting rods. 

3.3.17  Again pump grout into the system after setting period of grout is over to ensure that all anchors 

are properly grouted. During setting, heavier grout has a tendency to settle down leaving water at 
top with a possibility that anchor is not properly grouted. Rule this possibility out by pumping in 
grout again and ensuring that any such water at the top is pumped out through the air vent tube 
and replaced by grout. 

CAUTION: 

To get correct displacement readings, ensure that anchor is properly grouted. This problem 
may be particularly faced in case of anchor in downward boreholes and in upward holes where 
with cement in grout settling down, there may only be water around the anchor. 

Summary of Contents for EDS-71P

Page 1: ...ucknow UP 226011 India P 91 522 2661039 42 Email geotech encardio com www encardio com International UAE Qatar Bahrain Bhutan Europe USA India Lucknow Delhi Kolkata Mumbai Chennai Bangalore Hyderabad...

Page 2: ...REHOLE EXTENSOMETER BHE 4 2 1 General Description 4 2 1 1 Reference head assembly 4 2 1 2 Displacement sensor 4 2 1 3 Connecting rod assembly 6 2 1 4 Anchor 7 2 2 Accessories 8 2 2 1 Junction box 8 2...

Page 3: ...ential roof or wall falls before they actually occur Roof or wall falls in underground cavities are almost invariably preceded by measurable sags as the strata opens up and the movement usually occurs...

Page 4: ...his manual WARNING Warning messages calls attention to a procedure or practice that if not properly followed could possibly cause personal injury CAUTION Caution messages calls attention to a procedur...

Page 5: ...he end to get a thorough grasp of the subject You will find a lot of unexpected information in the sections you feel you may skip For description of vibrating wire borehole extensometers manufactured...

Page 6: ...BHE reference head assembly Reference head assembly is supplied packed from factory as per items listed in figure 2 1 The sensor is separately supplied but it is very convenient to assemble it at sit...

Page 7: ...r Junction box assembly Reference button Reference plate Sensor lock nut Sensor tightening nut Link plate Center pillar 17 19 18 21 23 20 Cover 16 15 14 13 22 Nipple with chuck nut Grub screw M4x5 8 b...

Page 8: ...d to downward holes This is because in vertically upward holes the connecting rod is in tension whereas in downward holes it is in compression resulting in sagging or buckling Longer the extensometer...

Page 9: ...in flanged housing its face extends around 20 mm beyond rubber bush 10 Proper sealing in reference head assembly is especially necessary for upwards to horizontally slanting holes for preventing any...

Page 10: ...nsor to the observation room Alternatively a junction box is available for termination of cable from sensor and transmitting the signal through a multi core cable to the observation room 2 2 2 Cable F...

Page 11: ...oth strips soaked in cement during installation 3 1 3 Insert reference head assembly centralised in the 63 mm borehole Taking holes on flange as reference drill four holes 12 mm diameter x 125 mm deep...

Page 12: ...21 4 6821 4 6823 40 05 39 99 50 00 7947 7 7947 7 7946 0 7947 50 00 50 01 Error fs 0 23 0 03 Digit f X 10E 3 Linear gage factor G 8 848E 03 mm digit Thermal factor K 0 003 mm C Polynomial constants A 1...

Page 13: ...9150 1 9150 48 00 0 00 Max error FS 0 16 Linear gage factor G 25 83 mm Volts Displacement D is calculated with the following equation Linear D mm G R1 R0 R1 current reading R0 is initial reading in V...

Page 14: ...le lowest end of grout tube is tied with a cable tie to the connecting rod NOTE In upward to horizontally sloping borehole grout tube should be about 2 m longer than specified depth of anchor and tape...

Page 15: ...ss rod is supplied in coil form using cable ties It is very stiff material and must be carefully handled when unwinding as the end may snap back and cause personal injury 3 3 8 Guide end of fibreglass...

Page 16: ...nsion can be monitored In other words if only compression is expected set zero reading of sensor by extending shaft by around 10 mm If only extension is expected set zero reading of sensor by extendin...

Page 17: ...out pipe to grouting machine or pump grout till the entire cavity is filled and grout flows out of air vent pipe Be very careful that grout flowing out of air vent tube does not get into the flanged h...

Page 18: ...sensor to connecting rod clearly noting position of extensometer 1 CAUTION Never rotate shaft of displacement sensor in respect to the outside body This will permanently damage the sensor During inst...

Page 19: ...nstallation of the multi position borehole extensometer 3 4 1 Soldering iron 25 watt 3 4 2 Rosin 63 37 solder wire 3 4 3 Thread sealant Loctite 290 or equivalent 3 4 4 Cable jointing compound 3 4 5 Ac...

Reviews: