![ENANCER ONLY Installation Manual Download Page 10](http://html1.mh-extra.com/html/enancer/only/only_installation-manual_2405694010.webp)
ENANCER Electrónica S.A.
Page 10 of 17
Rua Max Grundig 9
4705-820 Braga Portugal [email protected]
Tel: +351 253 221 484 www.only-smartbuildings.com
Three-phase installations with more than one switch board
The three-phase installations with ONLY one switchboard should concentrate all the circuits with ONLY protected
with the same RCCB. Like this ONLY a D-BUSDRV is necessary for the installation.
If there are more than one switchboard or ONLY modules are divided by more than one RCCB, it is necessary to
use a floor driver D-FDRV, that provides not ONLY the BUS drive for the floor but also an isolated BUS
connection to another floor.
The electrical diagrams of the switchboards are as follows:
The connections in the switchboards are as follows (note that ONLY the automation part is indicated):
Fig. 5: Solution with floor BUS driver: Main switchboard
10A 10A 10A 10A 6A 6A
N
N
LIGHT1 LIGHT2 SHUTT SEC
CLIMA ONLY
TO CIRCUITS WITH ONLY ON FLOOR
RCCB
L N B B B B
D-FDRV
Q Q 0V 0V
MAI
N
FLOOR
TO OTHER
SWITCHBOARD
FROM MAINS
POWER SWITCH
TO OTHER SWITCHBOARD
OR RCCB
Sin
gle
ph
as
e p
ow
er
su
pp
ly
Lig
htin
g 1
Lig
htin
g 2
Sh
utte
rs
O
N
LY
S
ec
urit
y c
en
tra
l
O
N
LY
cli
m
atiz
atio
n c
om
m
an
ds
O
N
LY
BUS
d
riv
er
D
-F
D
R
V
–
3
m
od
ue
s
D-FDRV
Wa
ll s
oc
ke
ts
C
oo
ke
r
Wa
sh
ing
m
ac
hin
g
4x32A
4x25A
4x25A
10A 10A 6A
6A
6A
6A
16A 16A 16A
Sw
itc
h b
oa
rd
flo
or
1
BU
S t
o flo
or
1
3x
25A