Softsynchro
®
6
Operating instruction edition: 01.04.2018 9
2.3 Re-putting into operation
If the quick-change tap holder is back into operation as described in chapter 4, page
14, please go through the following steps:
-
Clean the quick-change tap holder with a duster to remove any conservation oil
Note
Do not use any aggressive solvents.
Do not use fibrous materials i.e. steel wool.
-
If necessary, prepare the quick-change tap holder as described in chapter 2.2,
page 7
2.4 Quick-change adapter
2.4.1 Application and choice of the quick-change adapter
The adaptation of the tap / cold-forming tap is executed via quick-change adapters.
The following quick-change adapters are available:
Type
HE2-IKZZ
Design for taps/cold-forming taps
with
internal coolant-lubricant bore
hole
Type
HE2-IKZ
Design for taps/cold-forming taps
without
internal coolant-lubricant bore
hole.
The coolant-lubricant supply is guided
along the tap/cold-forming tap shank
The tap/cold-forming tap is clamped and centered via three screws.
The torque arising during the thread producing cycle is transferred via the square
integrated in the quick-change adapter.
All quick-change adapters are suited for producing right/ and left-hand threads.
The clamping diameter is defined by the used tap/cold-forming tap. Each diameter
requires a separate adapter.