background image

6 Responsibility of the manufacturing plant

6.1 The products produced shall conform to the product standards, and if there
is any inconsistency, the company shall be responsible for replacing and
returning the goods.
6.2 Due to personal or property damage caused by defects in product
manufacturing, our company assumes corresponding responsibilities, but we
have no responsibility for one of the following situations: a) The purchaser and
the operating user do not follow the instructions, and do not follow the safety.
Precautions and cautionary instructions;
b) Violation of the product's transportation, installation, use, maintenance,
storage, etc., resulting in damage to the product, personal or property.
6.3 Our company will provide life-long maintenance and technical services for
the products. The quality problems incurred during the quality assurance
period will be free of charge for the user. 10. Replacement of accessories
When the parts need to be replaced, they must be purchased from the
company.

7 Storage and transportation

7.1 Storage: When storing the instrument, it should be placed in the original
packing box and placed in a well-ventilated clean room. The packing box
should be raised, the ambient temperature is - 10 °C ~ 40 °C, the relative
humidity is not more than 9 3%, no harmful gas is allowed, flammable,
explosive materials and corrosive gases.
7.2 Transportation: The instrument under packaging conditions is suitable for
road, rail, air and water transportation. It should be protected from severe
vibration and shock during loading and unloading and transportation, and
should not be damp. It should not be mixed or mixed with flammable and
corrosive substances. Transportation, specific requirements are in accordance
with the order contract.

8 Warranty Card

Summary of Contents for EMS MESOGUN SR-NV6130

Page 1: ...EMS Mesogun Use Manual Model SR NV6130 ...

Page 2: ...ence Please install use and operate properly according to the manual Do not disassemble this unit and modify any parts In addition to our authorized personnel it is forbidden for others to open the cover and open the host Non professionals are strictly forbidden to carry out maintenance and renovation without authorization If there is any fault during the operation please contact us This product d...

Page 3: ...plugged when the instrument is moving 9 When the instrument is moving vibration should be avoided as much as possible 10 The instrument should be placed in a stable place and at least 5 cm space should be left around to ensure the air flow and facilitate the heat dissipation of the instrument 11 The instrument can t cover any east to prevent the air outlet from plugging 12 Avoid using the instrume...

Page 4: ... instrument is in normal operation before use 4 Make sure that the grounding wire is connected correctly 5 Make sure that all the wires are properly connected and secure 6 When using the instrument together it must be used correctly otherwise it may be dangerous and must be noticed Contraindications 1 skin sensitive severe asthma 2 Cardiac rhythm implantable cardiac defibrillator or other electrom...

Page 5: ...d store the package for later transport or storage Check the attachment by pressing the packing list Check if there is any mechanical damage Remark If have some damage please contact our agent 2 2 The instrument should be placed in a clean ventilated room with a temperature of 5 C 40 C a humidity of no more than 80 avoiding direct sunlight Also make sure that the air vents are not ...

Page 6: ...least 5cm of clearance around the instrument Remember not to place objects on the instrument even if it is temporary 2 3 Inserting the accessory frame into the connector on the right side of the instrument Please according to the below ...

Page 7: ...2 4 Handle operation method and steps 2 4 1 Installing handle ...

Page 8: ...2 4 2 Fix the clip on the nanocrystal head to the fixing clip on the handle and insert it clockwise 2 4 3 Pour the solution into the liquid bottle ...

Page 9: ...he operation Inside the handle card slot 2 5 Start the machine enter the operation interface select the demonstration mode or use the I C card to enter the card 2 6 Put the salt water into the solution bottle and put it on the handle 2 7 installing the nanochip and click the button of tube cleaning to clean it 2 8 After finishing the cleaning click the button and return to the main operation inter...

Page 10: ...dle at any time 2 15 Wipe the medical repairing gel After 20 minutes clean and dry 2 16 Use Medical wound repairing mask after 20mins unloading mask and use raw salt water gauze block clean 2 17 After treatment clean the instrument pipeline first start the instrument to drain the residual product in the pipeline then put the warm water of about 40 degrees into the solution bottle install the devic...

Page 11: ...spection of the naked eye whether the wire is metamorphosed or deformed and if deformed it may cause a fire due to leakage Please change the power cord immediately c Control whether the handle is abnormal or broken through the inspection of the naked eye whether the output line is degraded or deformed if it is please change it immediately d Please check if the content of the instrument is correct ...

Page 12: ...ted with the customer service department or dealer of the company and should not be repaired without authorization and the company will not repair 5 3 1 Frequently malfunction and exclusion methods When the instrument is not working properly it should not be easily disassembled It should be checked with the customer service department or dealer of the company at the same time to find out the cause...

Page 13: ...e products The quality problems incurred during the quality assurance period will be free of charge for the user 10 Replacement of accessories When the parts need to be replaced they must be purchased from the company 7 Storage and transportation 7 1 Storage When storing the instrument it should be placed in the original packing box and placed in a well ventilated clean room The packing box should...

Page 14: ...d Responsible for repairs and updates the maintenance fee should be properly charged If the instrument fails it needs to be sent back for repair The buyer will pay the shipping back cost and the seller will charge the shipping out fee within six months from the date of purchase The freight will be borne by the buyer for more than half a year Product Name Customer Name Model Tel Purchase Date Addre...

Page 15: ......

Reviews: