background image

25231-0-0109

Page 6

Premium Vent-Free Firebox Framing Dimensions (in inches)

"A"

"B"

"C"

Model

Framing Height

Framing Width

Framing Depth

VFP32FB

41 1/2"

35"

21"

VFP36FB

41 1/2"

40"

21"

VFP42FB

41 1/2"

44"

21"

Attention:

 Add 3-3/4" to "A" Dimension when using flush mantel base.

Framing dimension A includes a three inch clearance for standoffs on firebox.

any vent-free gas Log Heater must be “For use with approved 

anSi Z21.11.2 unvented room heater.”
Follow and complete the installation instructions of the gas log set 

and the requirements of this firebox.
Check all fittings for leaks before lighting the gas log set.
In  planning  the  installation  for  the  firebox,  it  is  necessary  to 

determine where the unit is to be installed and whether optional 

accessories are desired. gas supply piping should also be planned 

at this time.

A gas shut off must be in this line.

The firebox can be mounted on any of these surfaces:

1.  A flat hard combustible or non-combustible surface.

2.  a  raised  platform  of  combustible  or  non-combustible 

material.

3.  Recessed into the floor as illustrated by

 figure 4

 (flush face), 

and 

figure 5

 (louvered models).

4.  Supported under all (4) corners of the firebox so that contact 

is made on all four perimeter edges on the bottom of the unit 

(Example: Four (4) concrete masonry blocks).

if  the  firebox  is  installed  directly  on  carpeting,  tile  or  other 

combustible material other than wood flooring, it should be installed 

on a metal or wood panel extending the full width and depth of 

the unit.

at this point, you should have decided what components to include 

in your installation, and where the firebox is to be located. If this 

has not been done, stop and consult your dealer for assistance with 

this planning.

planning your Installation

Please note that the optional BVa1 Fresh air kit available for use 

with the Vent Free Firebox must be installed at the time of the initial 

installation. Refer to pages 10, 11 and 12 for detailed instructions 

for the air kit.

accessory kits such as the FBB5 Blower kit, Trim kits, Mantles, 

Full Cabinet Mantels, plus other Decorative Frame, Hood, and 

Door accessory kits may be installed after the firebox is secured 

to the framed opening.

Refer  to  the  instructions  provided  with  each  of  the  optional 

accessory kits for proper installation and operation.

Firebox Framing

Firebox  framing  can  be  built  before  or  after  the  firebox  is  set 

in  place.  Framing  should  be  positioned  to  accommodate  wall 

covering and firebox facing material. The firebox framing should 

be constructed of 2 x 4 lumber or heavier. The framing headers may 

rest on the top of the firebox standoffs. Refer to 

figures 6 and 7

 

for firebox framing dimensions.

COMBUSTIBLE MATERIALS ALLOWED

NON-COMBUSTIBLE

FINISHING MATERIAL

TO FIREBOX OPENING

FLUSH

FACE

MODELS

LOUVERED

FIREBOX

MODELS

COMBUSTIBLE MATERIALS ALLOWED

figure 4

figure 5

figure 6

FiREBoX inSTaLLaTion inSTRUCTionS

Summary of Contents for VFP32FB2CF-2

Page 1: ...or assistance or additional in formation consult a qualified installer service agency or the gas supplier Carefully review the instructions supplied with the decora tive type unvented room heater for...

Page 2: ...talling Hood 8 9 Gas Line Connection 9 Optional Fresh Air Kit Installation Instructions 10 12 Optional Single Speed Blower Installations Instructions 13 15 Junction Box Wiring Installation Instruction...

Page 3: ...such component part or accessory Any such action may create a possible fire hazard Consult your local building codes Firebox Screen The firebox screen must be in place when the firebox is operating I...

Page 4: ...finishing materials may extend to the top standoff screws on the front edge of the outer wrap See Figures 2a 2b CLEARANCES 45 6 3 MAX PERPENDICULAR SIDE WALL FRONT FACE SIDE FIREBOX TOP VIEW COMBUSTI...

Page 5: ...irebox is 2 Leave at least 36 clearance from the front of the firebox MANTEL STANDARD HOOD 13 10 12 MAX 42 MIN CEILING TO TOP OF HOOD 11 1 2 MIN FIREBOX FACE 84 MIN CEILING TO FLOOR CEILING COMBUSTIBL...

Page 6: ...or other combustible material other than wood flooring it should be installed on a metal or wood panel extending the full width and depth of the unit At this point you should have decided what compon...

Page 7: ...39 1 2 43 1 2 34 1 2 39 1 2 43 1 2 C 21 7 16 21 7 16 21 7 16 21 7 16 21 7 16 21 7 16 D 27 1 4 32 1 4 36 1 4 27 1 4 32 1 4 36 1 4 E 38 1 2 38 1 2 38 1 2 38 1 2 38 1 2 38 1 2 F 31 36 40 31 36 40 G 27 13...

Page 8: ...desired they can be purchased as an option Attachment is the same as the standard black hood Flush Face Models 1 On flush face models loosen the two screws A holding firebox top to face panel then sli...

Page 9: ...TALL Contact your dealer for proper model Always use an external regulator for all LP fireboxes to reduce the supply tank pressure to a maximum of 14 w c This is in addition to the regulator fitted to...

Page 10: ...uce outside air to the fireplace or firebox as desired It must be installed prior to or at the time of fireplace or firebox installation to framing The FreshAir kit must be installed prior to the inst...

Page 11: ...LY OUTER CASING FRESH AIR ROD OUTSIDE AIR ROD BRACKET Figure 20 OUTSIDE AIR ROD BRACKET OPEN FRESH AIR ROD CONTROL LEVER LEFT SIDE VIEW OF FIREBOX OPENING TOP CUTAWAY VIEW DAMPER ASSEMBLY OUTER CASING...

Page 12: ...clamps or screws 3 Run the other end of the duct through the exterior wall cut out 4 From the outside of the building connect the duct to the collar on the outside air vent assembly with band clamp or...

Page 13: ...f the FBB5 Blower assembly It is recommended that installation of the wiring be performed by a qualified electrician See Figure 25 1 If installed turn OFF gas supply to firebox gas log 2 If applicable...

Page 14: ...minal Attach this terminal to the open terminal on the blower power cord See Figure 32 Connection B 10 Route the wires away from moving parts of the blower as sembly and retain wires together near the...

Page 15: ...a dirty blower wheel Remove fan and clean blower wheels Warning Unplugging of blower accessory will not stop the heater from cycling To turn off gas to the heater millivolt model push in gas control k...

Page 16: ...box Install a ULlisted cable clamp not supplied in the knockout hole Leave approximately 6 of wire in the junction box for connection Attach black wire to one side of the receptacle and white wire to...

Page 17: ...3 R9293 HEARTH LEDGE LEFT 20 R9294 R9294 R9294 R9294 HEARTH LEDGE CENTER 21 23004 23004 23004 23004 RETAINER HEARTH INDEX NO PART NUMBER DESCRIPTION VFP36FB2DL VFP36FB2EL VFP36FB2CL VFP36FB2DF VFP36FB...

Page 18: ...42FB2DL VFP42FB2EL VFP42FB2CL VFP42FB2DF VFP42FB2EF VFP42FB2CF 1 17247 17247 17247 17247 17247 17247 TOP STANDOFF 2 17187 17187 17187 N A N A N A UPPER LOUVER 3 10554 10554 10554 10554 10554 10554 FRA...

Page 19: ...25231 0 0109 Page 19 PARTS VIEW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 16 17 17 21 19 20 18...

Page 20: ...Air Kit 1 2 8 4 7 6 5 3 Deluxe and Premium Fireboxes BVA 1 Frame Kits Standard 3 Piece Frame Kits Black Brass Stainless Steel or Hammered Pewter Extruded Aluminum Frame Kits Black Brass Stainless Stee...

Page 21: ...s Steel finishes Contact dealer for all available optional louver accessories Bottom Trim Strip Available as optional kits in Black Brass Hammered Pew ter and Stainless Steel finishes Contact dealer f...

Page 22: ...25231 0 0109 Page 22 SERVICE NOTES...

Page 23: ...25231 0 0109 Page 23 SERVICE NOTES...

Page 24: ...s Empire Comfort Systems Inc 918 Freeburg Ave Belleville IL 62220 If you have a general question about our products please e mail us at info empirecomfort com If you have a service or repair question...

Reviews: