Vent-Free Firebox Framing Dimensions (in inches)

A

b

c

Model

Framing 

Height

Framing 

Width

Framing 

Depth

VFP32FB

38-7/8"

35-3/8"

20-9/16"

VFP36FB

38-7/8"

40-3/8"

20-9/16"

VFP42FB

38-7/8"

44-3/8"

20-9/16"

Attention:

 Add 3-3/4 inches to "A" Dimension when using flush 

mantel base.

Any vent-free Gas Log Heater must be “For use with approved ANSI 

Z21.11.2 unvented room heater.”
Follow and complete the installation instructions of the gas log set 

and the requirements of this firebox.
Check all fittings for leaks before lighting the gas log set.
In planning the installation for the firebox, it is necessary to determine 

where the unit is to be installed and whether optional accessories 

are desired. Gas supply piping should also be planned at this time.

A gas shut-off must be in this line.

The firebox can be mounted on any of these surfaces:

1.  A flat hard combustible or non-combustible surface.

2.  A raised platform of combustible or non-combustible material.

3.  Recessed into the floor as illustrated by

 Figure 4

 (flush face), 

and 

Figure 5

 (louvered models).

4.  Supported under all four corners of the firebox so that contact 

is made on all four perimeter edges on the bottom of the unit 

(Example: Four concrete masonry blocks).

If the firebox is installed directly on carpeting, tile or other combustible 

material other than wood flooring, it should be installed on a metal 

or wood panel extending the full width and depth of the unit.

At this point, you should have decided what components to include 

in your installation, and where the firebox is to be located. If this 

has not been done, stop and consult your dealer for assistance 

with this planning.

Planning Your Installation

Please note that the optional VFA2 Fresh Air kit available for use 

with the Vent Free Firebox must be installed at the time of the initial 

installation. Refer to pages 10, 11 and 12 for detailed instructions 

for the air kit.

Accessory kits such as the FBB5 Blower kit, Trim kits, Mantles, Full 

Cabinet Mantels, plus other Decorative Frame, Hood, and Door 

accessory kits may be installed after the firebox is secured to the 

framed opening.

Refer to the instructions provided with each of the optional accessory 

kits for proper installation and operation.

Firebox Framing

Firebox framing can be built before or after the firebox is set in place. 

Framing should be positioned to accommodate wall covering and 

firebox facing material. The firebox framing should be constructed 

of 2 x 4 lumber or heavier. Maintain 3/4" clearance across entire top 

of firebox. Refer to 

Figures 6 and 7

 for firebox framing dimensions.

Figure 4

Figure 5

Figure 6

FIrebOx INSTALLATION INSTrucTIONS

LOUVERED

FIREBOX

MODELS

COMBUSTIBLE MATERIALS ALLOWED

Summary of Contents for VFP32FB0F

Page 1: ...this firebox unless this firebox meets the minimum dimensions required for the installation PREMIUM Vent Free Universal Fireboxes GAS FIRED WARNING FIRE OR EXPLOSION HAZARD Failure to follow safety w...

Page 2: ...NE CONNECTION 9 OPTIONAL FRESH AIR KIT INSTALLATION INSTRUCTIONS 10 12 OPTIONAL FBB5 SINGLE SPEED BLOWER INSTALLATION INSTRUCTIONS 13 15 JUNCTION BOX WIRING INSTALLATION INSTRUCTIONS 16 MAINTENANCE 16...

Page 3: ...f such component part or accessory Any such action may create a possible fire hazard Consult your local building codes Firebox Screen The firebox screen must be in place when the firebox is operating...

Page 4: ...Figure 1 Firebox Side and Back Clearances The firebox outer casing side and back flanges are zero clearance to combustibles Top Framing and Finishing Combustible finishing materials requires 3 4 inch...

Page 5: ...the non combustible board supplied with the fireplace before adding paint tile or stone Attach tile or other non combustible products to the fireplace face and to the non combustible area Figures 29 a...

Page 6: ...alled directly on carpeting tile or other combustible material other than wood flooring it should be installed on a metal or wood panel extending the full width and depth of the unit At this point you...

Page 7: ...2 Height from the bottom of the box to the upper gas line opening 8 4 8 4 8 4 8 4 8 4 8 4 L Depth from the front of the box to the gas line opening 15 7 15 7 15 7 15 7 15 7 15 7 M Depth from the rear...

Page 8: ...less steel or hammered pewter hoods are desired they can be purchased as an option Attachment is the same as the standard black hood Flush Face Models 1 On flush face models loosely attach two screws...

Page 9: ...ane fireboxes to reduce the supply tank pressure to a maximum of 14 inch w c This is in addition to the regulator fitted to the log set WARNING Connection directly to an unregulated propane tank can c...

Page 10: ...or to or at the time of firebox installation to framing The Fresh Air kit must be installed prior to the installation of wallboard or other finishing materials around the unit Hardware needed not prov...

Page 11: ...ilding 2 Secure the 4 inch diameter duct to the Slide Assembly collar on the firebox with band clamps or screws installer supplied 3 Run the other end of the duct through the exterior wall cutout 4 Fr...

Page 12: ...0 1018 Page 12 OPTIONAL FRESH AIR KIT INSTALLATION INSTRUCTIONS 1 2 3 PARTS LIST INDEX NO PART NO DESCRIPTION 1 29259 Outside Air Vent Assembly 2 29257 Slide Assembly 3 29263 Handle Retainer Hardware...

Page 13: ...wer assembly It is recommended that installation of the wiring be performed by a qualified electrician See Figure 20 1 If installed turn OFF gas supply to firebox gas log 2 If applicable turn OFF elec...

Page 14: ...erminal Attach this terminal to the open terminal on the blower power cord See Figure 27 Connection B 9 Route the wires away from moving parts of the blower assem bly and retain wires together near th...

Page 15: ...indi cates a dirty blower wheel Remove fan and clean blower wheels Blower Wiring See Figure 26 For Wiring WARNING Unplugging of blower accessory will not stop the heater from cycling To turn off gas...

Page 16: ...the electrical connection make sure that main power supply is disconnected The appliance when installed must be electrically grounded in accordance with local codes or in the absence of local codes wi...

Page 17: ...se and can be ordered by your Service Person or Dealer Proof of purchase is required for warranty parts All parts listed in the Parts List have a Part Number When ordering parts first obtain the Model...

Page 18: ...BLOWER COVER PLATE 5 R7051 R7052 R7053 R7051 R7052 R7053 ROD SCREEN QUANTITY 2 6 39517 39517 39518 39518 39519 39519 HOOD 7 R9292 R9292 R9292 R9292 R9292 R9292 HEARTH LEDGE RIGHT 8 R9293 R9293 R9293 R...

Page 19: ...39005 0 1018 Page 19 PARTS VIEW 13 14 11 3 2 1 5 5 4 6 12 11 7 8 9 10...

Page 20: ...V 1 Brick Liners Liner for Firebox Contact dealer for all available optional liner kits Fresh Air Kit Deluxe and Premium Fireboxes VFA2 Frame Kits 3 Piece Frame Kits Black Stainless Steel or Hammered...

Page 21: ...hes Contact dealer for all available optional louver accessories Bottom Trim Strip Available as optional kits in Brass Hammered Pewter and Stainless Steel finishes Contact dealer for all available opt...

Page 22: ...ctive workmanship within one year from the date of purchase Empire will repair or replace at Empire s option Duties Of The Owner The appliance must be installed by a qualified installer and operated i...

Page 23: ...39005 0 1018 Page 23 APPLIANCE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...

Page 24: ...ww empirecomfort com Empire Comfort Systems Inc Belleville IL If you have a general question about our products please e mail us at info empirecomfort com If you have a service or repair question plea...

Reviews: