background image

39000-1-0219

Page 6

Deluxe Vent-Free Firebox Framing Dimensions (in inches)

Model

A

b

C

Framing 

Height

Framing 

Width

Framing 

Depth

VFD32FB

33 3/4

35 1/2

16 1/4

VFD36FB

35 3/4

40 1/2

18 3/4

VFD42FB

35 3/4

44 1/2

18 3/4

Attention:

 Add 3-3/4 inches to "A" Dimension when using flush 

mantel base.

Any vent-free Gas Log Heater must be “For use with approved ANSI 

Z21.11.2 unvented room heater.”
Follow and complete the installation instructions of the gas log set 

and the requirements of this firebox.
Check all fittings for leaks before lighting the gas log set.
In planning the installation for the firebox, it is necessary to determine 

where the unit is to be installed and whether optional accessories 

are desired. Gas supply piping should also be planned at this time.

A Gas Shut Off Must be In This Line.

The firebox can be mounted on any of these surfaces:

1.  A flat hard combustible or non-combustible surface.

2.  A raised platform of combustible or non-combustible material.

3.  Recessed into the floor as illustrated by

 Figure 4

 (flush face), 

and 

Figure 5

 (louvered models).

4.  Supported under all four corners of the firebox so that contact 

is made on all four perimeter edges on the bottom of the unit 

(Example: Four concrete masonry blocks).

If the firebox is installed directly on carpeting, tile or other combustible 

material other than wood flooring, it should be installed on a metal 

or wood panel extending the full width and depth of the unit.

At this point, you should have decided what components to include 

in your installation, and where the firebox is to be located. If this 

has not been done, stop and consult your dealer for assistance 

with this planning.

Planning Your Installation

Please note that the optional VFA2 Fresh Air kit available for use 

with the Vent Free Firebox must be installed at the time of the initial 

installation. Refer to pages 10, 11 and 12 for detailed instructions 

for the air kit.

Accessory kits such as the FBB5 Blower kit, Trim kits, Mantels, Full 

Cabinet Mantels, plus other Decorative Frame, Hood, and Door 

accessory kits may be installed after the firebox is secured to the 

framed opening.

Refer to the instructions provided with each of the optional accessory 

kits for proper installation and operation.

Firebox Framing

Firebox framing can be built before or after the firebox is set in place. 

Framing should be positioned to accommodate wall covering and 

firebox facing material. The firebox framing should be constructed 

of 2 x 4 lumber or heavier. The framing headers must be at least 

3/4 inch above the fireplace. Refer to 

Figures 6 and 7

 for firebox 

framing dimensions.

Figure 4

Figure 5

Figure 6

FIREbOx INSTALLATION INSTRUCTIONS

LOUVERED

FIREBOX

MODELS

COMBUSTIBLE MATERIALS ALLOWED

Summary of Contents for VFD00FB3MF-4

Page 1: ...the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier INSTALLER Leave this manual with the appliance CONSUMER Retain this manual for future reference Do not attempt to modify or alter the construction of the firebox or its components Any modification or al...

Page 2: ...Instructions 6 8 Installing Hood 8 9 Gas Line Connection 9 Optional FBB5 Single Speed Blower Installation Instructions 10 12 Junction Box Wiring Installation Instructions 13 Maintenance 13 Parts List 14 Parts View 15 Accessories 16 17 Master Parts Distributor List 18 How To Order Repair Parts 18 Warranty 19 SECTION PAGE ...

Page 3: ...proval of such component part or accessory Any such action may create a possible fire hazard Consult your local building codes Firebox Screen The firebox screen must be in place when the firebox is operating Instructions to Installer 1 Installer must leave instruction manual with owner after installation 2 Installer must have owner fill out and mail warranty card supplied with firebox 3 Installer ...

Page 4: ...ndicular combustible side wall should not be less than 6 inches See Figure 1 Firebox Side and Back Clearances The firebox outer casing side and back flanges are zero clearance to combustibles Top Framing and Finishing Combustible finishing materials requires 3 4 inch to top of unit See Figure 2 CLEARANCES 45 6 3 MAX PERPENDICULAR SIDE WALL FRONT FACE SIDE FIREBOX TOP VIEW COMBUSTIBLE MATERIALS ALL...

Page 5: ...he clearance requirements detailed below Grate Clearance The minimum clearance between the front legs of the grate and front edge of the firebox is 2 inches Leave at least 36 inches clearance from the front of the firebox Figure 3 Clearances to Combustibles CLEARANCES MANTEL 13 10 12 MAX 8 MIN FIREBOX FACE CEILING COMBUSTIBLES ALLOWED 3 4 COMBUSTIBLE CLEARANCE REQUIRED FROM TOP EDGE OF FIREBOX 10 ...

Page 6: ...d directly on carpeting tile or other combustible material other than wood flooring it should be installed on a metal or wood panel extending the full width and depth of the unit At this point you should have decided what components to include in your installation and where the firebox is to be located If this has not been done stop and consult your dealer for assistance with this planning Plannin...

Page 7: ... 40 31 36 40 G 22 1 4 24 1 4 24 1 4 22 1 4 24 1 4 24 1 4 H 1 3 16 1 3 16 1 3 16 6 1 8 6 1 8 6 1 8 I 31 1 2 33 1 2 33 1 2 28 3 8 30 3 8 30 3 8 J 8 5 16 8 5 16 8 5 16 8 5 16 8 5 16 8 5 16 K 4 3 4 4 3 4 4 3 4 4 3 4 4 3 4 4 3 4 L 30 1 4 34 5 8 36 5 8 30 1 4 34 5 8 36 5 8 M 60 3 8 69 1 8 73 60 3 8 69 1 8 73 N 2 11 16 2 11 16 2 11 16 2 11 16 2 11 16 2 11 16 O 42 5 8 48 7 8 51 3 4 42 5 8 48 7 8 51 3 4 IN...

Page 8: ...ass stainless steel or hammered pewter hoods are desired they can be purchased as an option Attachment is the same as the standard black hood Flush Face Models 1 On flush face models loosen the two screws A holding firebox top to face panel then slide the hood flange between the firebox top and face panel and re tighten the screws 2 Install one screw at each end of the hood as shown C Louvered Mod...

Page 9: ...x wrap may have a round metal knockout that must be removed also Use a screwdriver to punch out the metal knockout Check gas type Use only the gas type indicated on the gas log set rating plate If the gas listed on the plate is not your type of gas supply DO NOT INSTALL Contact your dealer for proper model Always use an external regulator for all Propane fireboxes to reduce the supply tank pressur...

Page 10: ...power to the Firebox and control the operation of the FBB5 Blower assembly It is recommended that installation of the wiring be performed by a qualified electrician See Figure 13 1 If installed turn OFF gas supply to firebox gas log 2 If applicable turn OFF electric supply to firebox CAUTION All wiring should be done by a qualified electrician and shall be in compliance with all local city and sta...

Page 11: ...ute the wires away from moving parts of the blower assem bly and retain wires together near the blower motor using the plastic purse clip provided 11 To complete the installation plug the power cord into the junc tion box receptacle at the right rear corner of the firebox outer wrap See Figure 17 12 If room permits the power cord can be located from the out side of the unit looking through the jun...

Page 12: ...an blower wheels WARNING Unplugging of blower accessory will not stop the heater from cycling To turn off gas to the heater millivolt model push in gas control knob slightly and turn clockwise to OFF Do not force To turn off gas on direct ignition model turn gas line valve to OFF 1 R7731 BLOWER ASSEMBLY 2 R8199 FAN CONTROL SWITCH 3 R8147 WIRE ASSEMBLY 4 R7615 CORDSET 110 VOLT AC JUNCTION BOX WHITE...

Page 13: ...x Install a UL listed cable clamp not supplied in the knockout hole Leave approximately 6 inches of wire in the junction box for connection Attach black wire to one side of the receptacle and white wire to opposite side of receptacle The ground wire should be attached to the green neutral screw Install the receptacle into the junction box Attach cover plate Keep the control compartment logs and bu...

Page 14: ...UANTITY 2 8 R10388 R10392 R10392 BRICK PANEL RIGHT REFRACTORY BRICK 8 31675 31678 31678 BRICK PANEL RIGHT FIBER BRICK 9 R10386 R10390 R10394 BRICK PANEL BACK REFRACTORY BRICK 9 31676 31679 31680 BRICK PANEL BACK FIBER BRICK 10 R10387 R10391 R10391 BRICK PANEL LEFT REFRACTORY BRICK 10 31674 31677 31677 BRICK PANEL LEFT FIBER BRICK 11 39517 39518 39519 HOOD 12 R7051 R7052 R7053 ROD SCREEN QUANTITY 2...

Page 15: ...39000 1 0219 Page 15 PARTS VIEW 1 2 5 4 3 6 10 9 8 7 12 12 16 11 13 14 15 ...

Page 16: ... 1 Brick Liners Deluxe Firebox Contact dealer for all available optional liner kits Fresh Air Kit 1 2 3 Deluxe and Premium Fireboxes VFA2 Frame Kits 3 Piece Frame Kits Black Stainless Steel or Hammered Pewter Contact dealer for all available optional frame kits Standard Hood Brass hood BR Stainless Steel SS Hammered Pewter HP Contact dealer for all available optional hood accessories ACCESSORIES ...

Page 17: ...s Contact dealer for all avail able optional louver acces sories Bottom Trim Strip Available as optional kits in Brass Hammered Pew ter and Stainless Steel finishes Contact dealer for all avail able optional trim acces sories Decorative Door Kits Available as optional kits in Brass Hammered Pew ter and Stainless Steel finishes Contact dealer for all avail able optional frame kit ac cessories Decor...

Page 18: ...ase and can be ordered by your Service Person or Dealer Proof of purchase is required for warranty parts All parts listed in the Parts List have a Part Number When ordering parts first obtain the Model Number and Serial Number from the name plate on your equipment Then determine the Part Number not the Index Number and the Description of each part from the fol lowing illustration and part list Be ...

Page 19: ...ective workmanship within one year from the date of purchase Empire will repair or replace at Empire s option Duties Of The Owner The appliance must be installed by a qualified installer and operated in accordance with the instructions furnished with the appliance A bill of sale cancelled check or payment record should be kept to verify purchase date and establish warranty period Ready access to t...

Page 20: ...www empirecomfort com Empire Comfort Systems Inc Belleville IL If you have a general question about our products please e mail us at info empirecomfort com If you have a service or repair question please contact your dealer ...

Reviews: