บริษัท เอดีดี เฟอร์เนส จ ำกัด
ADD FURNACE CO.,LTD.
44 ซอยบรมราชชนนี
70 ถนนบรมรำชชนนี แขวงศำลำธรรมสพน์ เขตทวีวัฒนำ กรุงเทพฯ 10170
โทร
: 02-888-3472
โทร
(.
ออกแบบ
)
:08-08-170-170
แฟกซ์
: 02-888-3258
https://www.add-furnace.com E-mail:
The unit is designed for panel
mounting.
1- Insert the unit in the panel cut-out
from the front side.
2-Insert the mounting clamps to the
holes that located top and bottom
sides of device and screw up the
fixing screws until the unit
completely immobile within the
panel
Montage of the unit to a system must be done with it‟s own fixing clamps. Do not
do the montage of the device with inappropriate fixing clamps. Be sure that
device will not fall while doing the montage.
Before starting to remove the unit from panel, power off the unit and the related
system.
1-Loosen the screws.
2-Pull mounting clamps from top
and bottom fixing sockets.
3-Pull the unit through the front
side of the panel
2.6 Installation Fixing Clamp
2.7 Removing from the Panel