ENVIROMASTER INTERNATIONAL LLC
6
START UP SHEET EXAMPLE
ENVIROMASTER INTERNATIONAL LLC
5780 SUCCESS DRIVE
ROM E, NY 13440
TEL: 1-800-228-9364
FA X: 1-800-232-9364
HTTP ://WWW.ENVIROM A STER.COM
COMMENT:
INITIAL TEST
PRESSURE
FINAL TEST
PRESSURE
TEST DURATION
GPM
V
V
YES/NO
YES/NO
YES/NO
YES/NO
YES/NO
YES/NO
YES/NO
PSIG
PSIG
ºF
ºF
NOTE
: A START UP SHEET FOR EVERY UNIT MUST BE RETURNED TO EMI TO VALIDATE THE WARRANTY.
EMI CASSETTE - CAH/W, CAF/4
TO BE COMPLETED IN CONJUNCTION WITH START UP PROCEDURE
RETURN ONE COP Y TO EM I A ND RETA IN ORIGINA L FOR YOUR RECORDS
TECHNICIAN:
MODEL/SERIAL NO:
COMPANY:
PROJECT:
DATE:
1.7 JUMPERS SET CORRECTLY (MICRO ONLY)
2.1 DISABLE COMPRESSOR SIGNAL
1.1 UNIT CONDITION SATISFACTORY
1.2 PRESSURE TEST WITH DRY NITROGEN
1.3 DESIGN WATER FLOW AVAILABLE IF
CHILLED WATER UNIT
1.4 VOLTAGE AT OUTDOOR UNIT
2.6 CONDENSATE PUMP OPERATES
2.0 START UP CHECKLIST - INDOOR UNIT
3.0 START UP CHECKLIST - OUTDOOR UNIT
(REFER TO THE RELEVANT OUTDOOR UNIT MANUAL AND, IN ADDITION, NOTE THE FOLLOWING:
1.0 PRE START UP CHECKLIST
2.2 ON/OFF WORKS
2.3 INDOOR UNIT: THREE FANS SPEEDS
AVAILABLE (MICRO ONLY)
2.4 VANE SWEEP FUNCTIONS
2.5 TIMER FUNCTIONS OPERATE (MICRO ONLY)
1.5 VOLTAGE AT INDOOR UNIT
1.6 ELECTRICAL CONNECTIONS TIGHT
35. INDOOR AIR TEMPERATURE
3.1 OPERATING PRESSURES
3.2 SUCTION
3.3 DISCHARGE
3.4 AMBIENT TEMPERATURE
8. For microprocessor controlled units, check that
the display panel cable is properly connected to
the microprocessor main circuit board and that the
jumper links are correctly set (refer to unit wiring
schematic). If the links are set incorrectly, remove
main power before making any changes.
9. For microprocessor controlled units, check that
the battery on the main circuit board is in place
and properly connected. Check also that the bat-
teries are installed in the infrared unit.
START UP PROCEDURES
Once the above pre-start checks have been carried out sat-
isfactorily, the main start up operation can begin.
IMPORTANT: The jumper links referenced in step
8 must be correctly set before applying mains
power, to ensure correct operation of unit. (micro
units only)