![Emerson T-60 Operator'S Manual Download Page 41](http://html.mh-extra.com/html/emerson/t-60/t-60_operators-manual_104594041.webp)
When power is turned on to the T-60 and the DX Drive, the
ApplicationBuilder program will test for communication’s integrity, and
begin execution. If the T-60 is unable to establish communications, check the
following items:
•
Verify that the DX Drive Amplifier is on and in working order.
•
A power-on sequence must be setup which automatically starts executing
on power up.
•
Verify the connections made between the drive and the T-60.
Figure 13
Installation
Application Examples
Parallel I/O Made Simple
33
Summary of Contents for T-60
Page 1: ...T 60 Operator s Manual P N 400248 00 Rev A3 Date November1 1995 ...
Page 2: ......
Page 4: ...ii ...
Page 8: ...Table of Contents vii ...
Page 12: ...T 60 Operator s Manual 4 ...
Page 15: ...Figure 3 Mounting Figure 4 Mounting Clips Installation Through Panel Mounting 7 ...
Page 38: ...T 60 Operator s Manual 30 ...
Page 44: ...T 60 Operator s Manual 36 ...
Page 52: ...T 60 Operator s Manual 44 ...
Page 64: ...T 60 Operator s Manual 56 ...
Page 66: ...Figure 21 Physical Dimensions T 60 Operator s Manual 58 ...
Page 113: ...Appendix A List of Figures A 3 ...