SDU 24-BATEM Instruction Manual  •  A272-148 Rev. 2 9/2021

Page 

5

step 5:

  Slide bracket forward inside the enclosure, secure bracket 

in place and use the four (4) screws to mount the bracket 

on the enclosure.

step 6: 

 Use the following connection diagram to assure the correct 

batteries connection to the polarized terminal connector  

and to the circuit breaker.

r=red terminal
b=blacK terminal
cb=circuit breaKer

R

R

B

+

+

+

-

B

CB

-

-

Polarized Te

rminal

step 7: 

 Slide the top cover on the enclosure then use the four (4) 

screws for a secure mounting.

The Emerson logo is a trademark and service mark of Emerson Electric Co.  Appleton Grp LLC d/b/a Appleton Group. SolaHD is a registered trademark of Appleton Grp LLC. All other marks are 

the property of their respective owners. 

© 2021 Emerson Electric Co. All rights reserved. 

United states  

(headquarters) 

Appleton Grp LLC

9377 W. Higgins Road

Rosemont, IL 60018

United States

T +1 800 621 1506

Australia Sales Office

Bayswater, Victoria

T +61 3 9721 0348

europe 

ATX SAS

Espace Industriel Nord

35, rue André Durouchez, 

CS 98017

80084 Amiens Cedex 2

France

T +33 3 2254 1390

China Sales Office

Shanghai

T +86 21 3338 7000

Canada

EGS Electrical Group 

Canada Ltd.

99 Union Street

Elmira ON, N3B 3L7

Canada

T +1 888 765 2226

Middle East Sales Office

Dammam, Saudi Arabia

T +966 13 510 3702

Chile Sales Office

Las Condes

T +56 2928 4819

India Sales Office

Chennai

T +91 44 3919 7300

Korea Sales Office

Seoul

T +82 2 3483 1555

Asia Pacific 

EGS Private Ltd.

Block 4008, Ang Mo Kio 

Ave 10, 

#04-16 TechPlace 1, 

Singapore 569625 

T +65 6556 1100

Latin America 

EGS Comercializadora 

Mexico S de RL de CV

Calle 10 N°145 Piso 3

Col. San Pedro de los Pinos

Del. Álvaro Obregon

Ciudad de México. 01180

T +52 55 5809 5049

Summary of Contents for SDU 24-BATEM

Page 1: ... harmful to skin and eyes It may be toxic For battery recycling information contact CSB recycling network at 1 800 738 7372 what s included 1 SDU 24 BATEM External battery module 2 SDU 24 EXTBC6 Pair of 6 foot polarized cables for connecting the external battery module to the power module NOTE The circuit breaker must be in the open position O prior to installation SDU 24 BATEM Installation The SD...

Page 2: ...A 1 EBP 135 52 28 19 14 SDU 20 24B with SDU 24 BATEM Load 20 4A 40 8A 60 12A 80 16A 100 20A 1 EBP 48 17 9 6 4 SDU 24 batem specifications Parameter SDU 24 BATEM Nominal Voltage 24 VDC Protection Circuit Breaker 24V 25A Charging Current 1 2 Enclosure Dimension in mm 11 5 x 5 57 x 4 57 292 x 142 x 116 Enclosure Type NEMA 1 Terminal Connector Type Polarized Powerpole Connectors Batteries Replaceable ...

Page 3: ...e Dispose of old batteries according to local codes CAUTION ELECTRICAL SAFETY PRE CAUTIONS MUST BE FOLLOWED WHEN INSTALLING OR SERVICING THIS EQUIPMENT TO PREVENT RISK OF ELECTRICAL SHOCK TURN OFF AND LOCK OUT ALL POWER SOURCES TO THE UNIT BEFORE MAKING ELECTRICAL CONNECTIONS OR SERVICING CAUTION WHEN REMOVING AND INSTALLING THE NEW BATTERIES EXTREME CARE MUST BE USED NOT TO SHORT METAL CHASSIS PA...

Page 4: ...to Replace the Batteries Step 1 Remove four 4 screws from cover and slide cover forward off enclosure Step 2 Remove wires from battery posts Step 3 Remove four 4 screws from enclosure but secure bracket in place and then slide bracket forward from enclosure Step 4 Remove failed batteries and insert new Replaceable Batteries ...

Page 5: ...rs 2021 Emerson Electric Co All rights reserved United States Headquarters Appleton Grp LLC 9377 W Higgins Road Rosemont IL 60018 United States T 1 800 621 1506 Australia Sales Office Bayswater Victoria T 61 3 9721 0348 Europe ATX SAS Espace Industriel Nord 35 rue André Durouchez CS 98017 80084 Amiens Cedex 2 France T 33 3 2254 1390 China Sales Office Shanghai T 86 21 3338 7000 Canada EGS Electric...

Reviews: