Chapter 2
RTM-ATCA-F140 Installation and Use (6806800M97A)
21
Hardware Preparation and Installation
2.1
Overview
Inspect the shipment and unpack the RTM.
Make sure environmental and power requirements are met.
Install the RTM.
2.2
Unpacking and Inspecting the RTM
The shelf should provide minimum airflow to the RTM slot according to the class B.4
requirements of the CP-TA Inter-operability document AdvancedTCA Book 1.1. This includes
the following:
2.0 cfm at 25 °C ambient temperature
2.8 cfm at 40 °C ambient temperature
4.4 cfm at 55 °C ambient temperature
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment:
Printed
Quick Start Guide
and
Safety Notes Summary
RTM-ATCA-F140
Damage of Circuits
Electrostatic discharge and incorrect installation and removal of the blade can damage
circuits or shorten its life.
Before touching the blade or electronic components, make sure that you are working in
an ESD-safe environment.
EA Version
Summary of Contents for RTM-ATCA-F140
Page 6: ...RTM ATCA F140 Installation and Use 6806800M97A Contents 6 Contents Contents EA Version ...
Page 8: ...RTM ATCA F140 Installation and Use 6806800M97A 8 List of Tables EA Version ...
Page 10: ...RTM ATCA F140 Installation and Use 6806800M97A 10 List of Figures EA Version ...
Page 20: ...Introduction RTM ATCA F140 Installation and Use 6806800M97A 20 EA Version ...
Page 34: ...Controls LEDs and Connectors RTM ATCA F140 Installation and Use 6806800M97A 34 EA Version ...
Page 58: ...Functional Description RTM ATCA F140 Installation and Use 6806800M97A 58 EA Version ...
Page 60: ...Related Documentation RTM ATCA F140 Installation and Use 6806800M97A 60 EA Version ...
Page 70: ...Index RTM ATCA F140 Installation and Use 6806800M97A 70 EA Version ...
Page 71: ...EA Version ...