background image

April 2019

Quick Start Guide

Quick Start Guide

15

Summary of Contents for Rosemount HART Modbus VeriCase 3308 Series

Page 1: ...Quick Start Guide 00825 0500 4530 Rev AD April 2019 Rosemount VeriCase User Guide Rosemount 3308 and 5300 Series Level Transmitters with HART and Modbus ...

Page 2: ...Overview 3 Check contents and verification sheet 4 Verify the Rosemount 3308 transmitter 6 Verify the Rosemount 5300 transmitter 10 Generate a report 13 FAQs 14 Quick Start Guide April 2019 2 Rosemount VeriCase ...

Page 3: ...he case that you should be familiar with before performing verification Note The Rosemount VeriCase does not have any hazardous approvals certifications and should only be used outside of such classified areas Figure 1 1 Rosemount VeriCase A C D B G F E A Transmitter mount B Terminal connections C Cable switch D Temperature display E Power input F Ground connection G USB cable connection April 201...

Page 4: ...308 Wireless Level Transmitter Printed calibration parameters Printed certificate 110 220V Power Supply 12 VDC Power Cable USB A B cable Two terminal connection cables with banana plugs and grippers 2 2 Check the verification sheet Procedure 1 Open the Excel workbook found on the USB memory stick 2 Check that the following details in the workbook correspond to the printed certificate found inside ...

Page 5: ...edure 1 Connect the power cable 2 Screw the transmitter firmly onto the mount of the faceplate 3 Insert the terminal connectors in the and terminals on the faceplate and attach the other ends to the terminals of the transmitter 4 Connect the USB A B cable between your computer and the Rosemount VeriCase 5 To start the verification procedure the switch should be turned from position 0 to position 1...

Page 6: ...vice from the nameplate of the transmitter 2 Optional Select the Imperial Units check box to enter data in inches and Fahrenheit Note There is a possible inaccuracy of 1 25 mm 0 05 in when inches are used for the display Procedure 1 Start Instrument Inspector Application 2 Under HART double click the device icon Quick Start Guide April 2019 6 Rosemount VeriCase ...

Page 7: ...Maintenance and then select Verification 5 In the Verification window select Next 6 Enter the Distance and the Electronics Temperature displayed on the Verification window to the Excel workbook Note Make sure you convert the distance from meters to millimeters April 2019 Quick Start Guide Quick Start Guide 7 ...

Page 8: ...the Excel workbook 8 Switch to the next cable on the Rosemount VeriCase and then select Next 9 Repeat Step 6 Step 8 for all six cable lengths 10 When all the cables are measured select Finish and then select Next Quick Start Guide April 2019 8 Rosemount VeriCase ...

Page 9: ...11 After the configuration is restored disconnect communication to the transmitter April 2019 Quick Start Guide Quick Start Guide 9 ...

Page 10: ...ement units there is a possible inaccuracy of 1 25 mm 0 05 in when inches are used for the display Procedure 1 Configure device for verification a Select Device Backup Config to File and save a backup file of the current device The backup file needs to be reloaded once the verification is complete b Select Setup Tank and configure the following parameters for the transmitter that will be tested Pr...

Page 11: ...hese configuration changes and restart the device 2 Perform the verification test a Set the cable switch to position 1 Wait for the values to stabilize before taking a reading from the Device Display window in Rosemount Radar Master b Record the distance value the internal temperature of transmitter and the Rosemount VeriCase temperature c Repeat the procedure in 2 b for all six cable lengths in t...

Page 12: ...ing the backup file to the transmitter 4 1 Upload backup file to transmitter Procedure 1 Select Device Upload Config from File and reload the saved file 2 After the backup has been restored disconnect power and communication to the transmitter Quick Start Guide April 2019 12 Rosemount VeriCase ...

Page 13: ...utput of the transmitter under verification should be tested at 4 mA 12 mA and 20 mA and the results should be saved in the Q4 Data tab before generating the certificate Procedure 1 In the Verification Data tab select the Export Verification Data button to generate a verification report 2 In the Q4 tab select the Export Verification Data button to generate a Q4 certificate April 2019 Quick Start G...

Page 14: ... combined accuracy for the Rosemount 5300 and the Rosemount VeriCase as shown in the Excel workbook Q What does the offset value in the results mean Do I need to adjust anything in the guided wave radar settings A The offset is generated from the Rosemount VeriCase rather than the probe This is compensated automatically and there is no need for manual adjustments Q Why is the transmitter rebooted ...

Page 15: ...April 2019 Quick Start Guide Quick Start Guide 15 ...

Page 16: ...x 1046 CH 6340 Baar Switzerland 41 0 41 768 6111 41 0 41 768 6300 RFQ RMD RCC Emerson com Asia Pacific Regional Office Emerson Automation Solutions 1 Pandan Crescent Singapore 128461 65 6777 8211 65 6777 0947 Enquiries AP Emerson com Middle East and Africa Regional Office Emerson Automation Solutions Emerson FZE P O Box 17033 Jebel Ali Free Zone South 2 Dubai United Arab Emirates 971 4 8118100 971...

Reviews: