Hardware Preparation and Installation
MVME7100 Single Board Computer Installation and Use (6806800E08C
)
26
2.2
Unpacking and Inspecting the Board
Read all notices and cautions prior to unpacking the product.
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment.
2. Check for damage and report any damage or differences to customer service.
3. Remove the desiccant bag shipped together with the board and dispose of it
according to your country’s legislation.
Program the board as needed for your
applications.
MVME7100 Single Board Computer Programmer’s Reference
Table 2-1 Startup Overview (continued)
Task
Page
Damage of Circuits
Electrostatic discharge and incorrect installation and removal can damage circuits or shorten
their life.
Before touching the board or electronic components, make sure that you are working in an ESD-
safe environment.
The product is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, contact customer service immediately.
Summary of Contents for MVME7100
Page 10: ...MVME7100 Single Board Computer Installation and Use 6806800E08C 10 List of Figures ...
Page 24: ...Introduction MVME7100 Single Board Computer Installation and Use 6806800E08C 24 ...
Page 92: ...Transition Module MVME7100 Single Board Computer Installation and Use 6806800E08C 92 ...
Page 124: ...Related Documentation MVME7100 Single Board Computer Installation and Use 6806800E08C 124 ...
Page 134: ...MVME7100 Single Board Computer Installation and Use 6806800E08C Sicherheitshinweise 134 ...
Page 137: ......