
Battery Installation 9
Battery Safety Precautions in French Per CSA Requirements
Instructions Importantes Concernant La Sécurité
Conserver Ces Instructions
$'9(57,66(0(17
'(63,(&(66286$/,0(17$7,216(5217/$,66((66$16
3527(&7,21'85$17&(6352&('85(6'·(175(7,(181
3(56211(/48$/,),((675(48,63285())(&78(5&(6
75$9$8;
/(6)86,%/(6$&&'(/$%$77(5,('·$&&808/$7(856
23(5(17(172877(036$/$7(16,21120,1$/(/$
35(6(1&('·81)86,%/($&&%58/(,1',48(81
352%/(0(6(5,(8;/(5(03/$&(0(17'(&()86,%/(
6$16$92,5'(7(50,1(/(65$,6216'(/$
'()(&7826,7(3(87(175$,1(5'(6%/(6685(628'(6
'200$*(66(5,(8;$/·(48,3(0(173285$66,67$1&(
$33(/(5/('(3$57(0(17'(6(59,&($/$&/,(17(/(
'(/,(%(57
'$1*(5
/HVDFFXPXODWHXUVSORPEDFLGHFRQWLHQQHQWGHODPDWLqUH
FRPSRUWDQWXQFHUWDLQULVTXH/HVDFFXPXODWHXUVGRLYHQWrWUH
PDQLSXOpVWUDQVSRUWpVHWUHF\FOpVRXpOLPLQpVHQDFFRUGDYHFOHV
ORLVIpGpUDOHVSURYLQFLDOHVHWORFDOHV3DUFHTXHOHSORPEHVWXQH
VXEVWDQFHWR[LTXHOHVDFFXPXODWHXUVSORPEDFLGHGHYUDLHQWrWUH
UHF\FOpVSOXW{WTX·pOLPLQpV
,OQHIDXWSDVEUOpOHRXOHVDFFXPXODWHXUV/·DFFXPXODWHXU
SRXUUDLWDORUVH[SORVp
,OQHIDXWSDVRXYULURXHQGRPPDJHUOHRXOHVDFFXPXODWHXUV
/·pOHFWURO\WHTXLSRXUUDLWV·HQpFKDSSHUHVWGRPPDJHDEOHSRXUOD
SHDXHWOHV\HX[
8QDFFXPXODWHXUUHSUpVHQWHXQULVTXHGHFKRFpOHFWULTXHHWGH
KDXWFRXUDQWGHFRXUWFLUFXLW/RUVTXHGHVDFFXPXODWHXUVVRQW
PDQLSXOpVOHVPHVXUHVSUpYHQWLYHVVXLYDQWHVGHYUDLHQWrWUH
REVHUYpHV
5HWLUHUWRXWHVPRQWUHEDJXHVRXDXWUHVREMHWV
PpWDOOLTXHV
8WLOLVHUGHVRXWLOVDYHFPDQFKRQLVROp
3RUWHUGHVJDQWVHWGHVERWWHVGHFDRXWFKRXF
1HSDVGpSRVHUOHVRXWLOVRXOHVSLqFHVPpWDOOLTXHVVXUOH
GHVVXVGHVDFFXPXODWHXUV
,QWHUURPSUHODVRXUFHGHFKDUJHDYDQWGHUDFFRUGHURX
GHGpEUDQFKHUOHVERUQHVGHODEDWWHULH
G·DFFXPXODWHXUV
'pWHUPLQHUVLO·DFFXPXODWHXUHVWPLVjODWHUUHSDU
HUUHXU6LRXLGpIDLUHFHWWHPLVHjODWHUUH7RXWFRQWDFW
DYHFXQDFFXPXODWHXUPLVjODWHUUHSHXWVHWUDGXLUHHQ
XQFKRFpOHFWULTXH/DSRVVLELOLWLpGHWHOVFKRFVVHUD
UpGXLWpVLGHWHOOHVPLVHVjODWHUUHVRQWGpEUDQFKpHV
SRXUODGXUpHGHO·LQVWDOODWLRQRXGHO·HQWUHWLHQ
Summary of Contents for Liebert Npower 30-130 kVA
Page 4: ......
Page 6: ......
Page 10: ......
Page 40: ...30 Installation Drawings 11 0 INSTALLATION DRAWINGS Figure 11 Outline Drawing 30 50 kVA UPS ...
Page 41: ...Installation Drawings 31 Figure 12 Outline Drawing 65 80 kVA UPS ...
Page 42: ...32 Installation Drawings Figure 13 Outline Drawing 100 130 kVA UPS ...
Page 45: ...Installation Drawings 35 Figure 16 Outline Drawing Maintenance Bypass Cabinet L Configuration ...
Page 46: ...36 Installation Drawings Figure 17 Outline Drawing Maintenance Bypass Cabinet N Configuration ...
Page 47: ...Installation Drawings 37 Figure 18 Outline Drawing Maintenance Bypass Cabinet P Configuration ...
Page 48: ...38 Installation Drawings Figure 19 Outline Drawing Maintenance Bypass Cabinet Q Configuration ...
Page 58: ...48 Installation Drawings Figure 29 Outline Drawing Seismic Anchoring 30 50 kVA UPS ...
Page 59: ...Installation Drawings 49 Figure 30 Outline Drawing Seismic Anchoring 65 80 kVA UPS ...
Page 60: ...50 Installation Drawings Figure 31 Outline Drawing Seismic Anchoring 100 130 kVA UPS ...
Page 61: ...Installation Drawings 51 Figure 32 Outline Drawing Remote Battery Breaker 30 130 kVA ...
Page 63: ...Installation Drawings 53 Figure 34 Outline Drawing Remote Battery Breaker with BIB Installed ...
Page 64: ...54 Installation Drawings Figure 35 Outline Drawing Remote Alarm Status Panel ...
Page 65: ...Installation Drawings 55 Figure 36 Outline Drawing LBS Control Panel ...
Page 66: ...56 Installation Drawings Figure 37 Outline Drawing LBS Alarm Status Contacts ...
Page 67: ...Installation Drawings 57 Figure 38 Outline Drawing LBS Transformer Panel ...
Page 70: ...60 Installation Drawings Figure 41 Control Wiring 30 130 kVA UPS ...
Page 73: ...Installation Drawings 63 Figure 44 Control Wiring Remote Alarm Status Panel Option ...
Page 74: ...64 Installation Drawings Figure 45 Control Wiring 2 or 3 Remote Alarm Status Panels ...
Page 76: ...66 Installation Drawings Figure 47 Control Wiring Site Scan Interface ...
Page 77: ...Installation Drawings 67 Figure 48 Control Wiring Programmable Relay Board Option ...
Page 78: ...68 Installation Drawings Figure 49 Control Wiring Input Contact Isolator Board ...
Page 79: ...Installation Drawings 69 Figure 50 Control Wiring NIC Option ...
Page 80: ...70 Installation Drawings Figure 51 Control Wiring Power Supply Option ...
Page 81: ...Installation Drawings 71 Figure 52 Control Wiring Internal Modem Option ...
Page 82: ...72 Installation Drawings Figure 53 Control Wiring AS 400 Signal Cable Option ...
Page 83: ...Installation Drawings 73 Figure 54 Control Wiring Open Wire Cable Adaptor Option ...
Page 84: ...74 Installation Drawings Figure 55 Control Connection Diagram 50 130 kVA ...
Page 85: ...Installation Drawings 75 Figure 56 Control Connection Location Diagram 30 130 kVA UPS ...
Page 86: ...76 Installation Drawings Figure 57 Terminal Details 30 50 kVA UPS ...
Page 87: ...Installation Drawings 77 Figure 58 Terminal Details 65 80 kVA UPS ...
Page 88: ...78 Installation Drawings Figure 59 Terminal Details 100 130 kVA UPS ...
Page 89: ...Installation Drawings 79 Figure 60 Schematic Diagram Maintenance Bypass Interlock System ...
Page 92: ...82 Installation Drawings Figure 63 Wiring Diagram UPS with Single Battery Cabinet ...
Page 98: ...88 ...
Page 99: ......