background image

Jumper Setup

5

4.0

J

UMPER

 S

ETUP

The card has five jumpers, P3 through P7, as shown in 

Figure 2

Each jumper connects two pins.

Figure 2

Jumper location and numbering

By default all five jumpers have shunts installed. The two pins are 

shunted together to provide the functions shown in 

Table 2

, allowing 

relay commons to be tied together.

NOTE:

 The jumpers should be removed if there is any external volt-

age source that may intentionally or inadvertently be connected to the 

relay.
Removing the shunt from any two pins breaks the connection between 

the relay commons so they are not tied together.

Table 2

Jumper connections

Jumper

Relay

P6

On Battery

P5

UPS Fault

P4

Low Battery

P3

On Bypass

P7

Summary Alarm

Jumper 

P6

Jumper 

P5

Jumper 

P4

Jumper 

P3

Jumper 

P7

FRONT OF 

CARD

Summary of Contents for Liebert IntelliSlot IS-RELAY

Page 1: ...ntelliSlot Relay Card User Manual Проконсультироваться и купить данное оборудование вы можете в компании АНД Системс адрес 125480 г Москва ул Туристская д 33 1 site https andpro ru тел 7 495 545 4870 email info andpro ru При обращении используйте промокод AND PDF и получите скидку ...

Page 2: ...t 1 2 0 INSTALLATION 2 Required Parts and Tools 2 Instructions 2 3 0 PIN CONFIGURATION 4 4 0 JUMPER SETUP 5 Figures Figure 1 Pin location and numbering 4 Figure 2 Jumper location and numbering 5 Tables Table 1 Relay card pin configuration 4 Table 2 Jumper connections 5 ...

Page 3: ...upported units the inverter shut off command can be controlled from the computer directly connected to the UPS via the factory installed DB9 connector and will conserve battery power after the workstation shutdown is completed The Liebert IntelliSlot Relay Card is rated for 24VAC VDC at 1A Inspecting Shipment on Receipt Upon accepting shipment inspect the packaging and product for any damaged or m...

Page 4: ...ort location and orientation 3 Remove the two retaining screws from the Liebert IntelliSlot port cover plate on the unit Save the screws for reassembly in Step 5 4 As you insert the card make sure the holes are aligned with those on the UPS Initially the card should slide in freely as you carefully align screw holes As you feel it click into place press firmly to ensure solid seating in the slot 5...

Page 5: ...nes for terminal block specifications Proceed to the following sections 3 0 Pin Configuration to configure the terminal blocks 4 0 Jumper Setup to configure the jumpers Acceptable Wire Size Wire Strip Length 24 16 AWG 0 24 0 28 in 6 7mm ...

Page 6: ...urs 3 Low Battery Closed if battery is OK 4 Common UPS Fault 5 UPS Fault Closed if UPS fault occurs 6 UPS Fault Closed if no UPS failure 7 Common On Battery 8 On Battery Closed if On Battery power Utility failure 9 On Battery Closed if not On Battery power Utility OK 10 Signal Ground Use for UPS Any Mode Shutdown 11 Signal Ground Use for UPS Any Mode Shutdown 12 UPS Any Mode Shutdown Turn UPS outp...

Page 7: ...able 2 allowing relay commons to be tied together NOTE The jumpers should be removed if there is any external volt age source that may intentionally or inadvertently be connected to the relay Removing the shunt from any two pins breaks the connection between the relay commons so they are not tied together Table 2 Jumper connections Jumper Relay P6 On Battery P5 UPS Fault P4 Low Battery P3 On Bypas...

Page 8: ...r Road Ortigas Center Pasig City 1605 Philippines 63 2 687 6615 Fax 63 2 730 9572 The global leader in enabling Business Critical Continuity Emerson Business Critical Continuity Emerson Network Power and the Emerson Network Power logo are trademarks and service marks of Emerson Electric Co or one of its affiliated companies 2010 Emerson Electric Co AC Power Connectivity DC Power Infrastructure Man...

Reviews: