1592040000 XR20-30-60-70T EN v1.5 2021.06.22
XR20-30-60-70T
19/41
n1L
Number of activations for relay output oA1 (units of)
n2H
Number of activations for relay output oA2 (thousands of)
n2L
Number of activations for relay output oA2 (units of)
n3H
Number of activations for relay output oA3 (thousands of)
n3L
Number of activations for relay output oA3 (units of)
n4H
Number of activations for relay output oA4 (thousands of)
n4L
Number of activations for relay output oA4 (units of)
n7H
Number of total activation of digital input 1 (thousand of)
n7L
Number of total activation of digital input 1 (units of)
n8H
Number of total activation of digital input 2 (thousand of)
n8L
Number of total activation of digital input 2 (units of)
F1H
Number of working hours for relay output oA1 (thousands of)
F1L
Number of working hours for relay output oA1 (units of)
F2H
Number of working hours for relay output oA2 (thousands of)
F2L
Number of working hours for relay output oA2 (units of)
F3H
Number of working hours for relay output oA3 (thousands of)
F3L
Number of working hours for relay output oA3 (units of)
F4H
Number of working hours for relay output oA4 (thousands of)
F4L
Number of working hours for relay output oA4 (units of)
5.1.12 Real Time Clock configuration parameters - rtC
Hur
Hours:
0 to 23 hours
Min
Minutes:
0 to 59 minutes
dAY
Day of the week:
Sun to Sat
dYM
Day of the month:
1 to 31
Mon
Month:
1 to 12
YAr
Year:
00 to 99
Hd1
First day of weekend:
(Sun to SAt; nu) setting for the first day of the weekend.
Hd2
Second day of weekend:
(Sun to SAt; nu) setting for the second day of the weekend.
iLE
Energy saving cycle start time on working days:
(00h00min to 23h50min) during the Energy
Saving cycle, the set point is increased by the value in HES so that the operation set point is
SET+HES
.
dLE
Energy saving cycle duration on working days:
(00h00min to 24h00min) sets the duration of
the Energy Saving cycle on working days.
iSE
Energy saving cycle start time on weekends:
00h00min to 23h50min
dSE
Energy saving cycle duration on weekends:
00h00min to 24h00min
ddx
Daily defrost enabled:
(n; Y) to enable the
Ld1 to Ld6
defrost operations for any day of the
week.
•
dd1
= Sunday defrost
•
dd2
= Monday defrost
•
dd3
= Tuesday defrost
•
dd4
= Wednesday defrost
•
dd5
= Thursday defrost
•
dd6
= Friday defrost
•
dd7
= Saturday defrost
Ldx
Defrost start time:
(00h00min to 23h50min) these parameters set the beginning of the
programmable defrost cycles during any
ddx
day. Example: when
Ld2=12.4,
the second defrost
starts at 12:40 am during working days.
5.1.13 Memory storage management
– E2
MAP
Current configuration:
(C-1; C-2) to change configuration used.
LdM
Restore default factory settings:
(n;Y) select Y and confirm to reload factory default values for
the configuration currently used.
rHA
Reset HACCP values:
(n; Y) select Y and confirm to reset the memorized min and MAX
temperature values (HACCP function must be enabled).
5.1.14 Serial Communication port configuration parameters - CoM
Adr
Serial address:
(1 to 247) device address for Modbus communication
bAU
Baudrate:
(9.6; 19.2; 38.4; 57.6) select the correct baudrate for serial communication
Summary of Contents for Dixell XR20T
Page 1: ...Full Touch XR20T XR30T XR60T XR70T V 1 5 ...
Page 2: ......