Figure 9-14: Downstream shaft nut installation
Important
The shaft nut can only be reused up to five times. Replace as needed.
9.5
Electronics enclosure disassembly
WARNING
ELECTRONIC HAZARD
Power off the electronics after every use.
Servicing the turbine meter while powered may result in death or serious injury.
Important
Do not use a hammer to assemble the housing.
9.5.1
Disassemble the LME/RME - Standard enclosure
Procedure
1. Uninstall the security seal wire.
2. Uninstall the security wire.
3. Uninstall the security latch.
4. Uninstall the solid end cap.
5. Uninstall the wiring connections from the preamplifier.
6. Loosen and remove the socket screws from the plate bracket to the housing.
7. Loosen and remove the preamplifier socket screw to the bracket plate.
8. Loosen the grounding lugs and remove the cable.
9. Uninstall the conduit.
User manual
Planned maintenance
P/N 3-9008-515
March 2019
User manual
95
Summary of Contents for Daniel Series
Page 2: ...2 ...
Page 11: ...Part I Plan User manual Plan P N 3 9008 515 March 2019 User manual 11 ...
Page 69: ...Part II Install User manual Install P N 3 9008 515 March 2019 User manual 69 ...
Page 79: ...Part III Operate User manual Operate P N 3 9008 515 March 2019 User manual 79 ...
Page 83: ...Part IV Maintain User manual Maintain P N 3 9008 515 March 2019 User manual 83 ...
Page 105: ...User manual P N 3 9008 515 March 2019 User manual 105 ...