15
© 2016 Emerson Climate Technologies, Inc.
AE4-1402 R4
Figure 3 – ZPV063 Operating Envelope
4
7
10
12
15
18
21
23
26
29
32
35
37
40
43
46
48
51
54
57
60
62
65
68
71
40
45
50
55
60
65
70
75
80
85
90
95
100
105
110
115
120
125
130
135
140
145
150
155
160
-25 -20 -15 -10
-5
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
Tc
ond (°F)
Tevap (°F)
ZPV063 Operating Envelope
20°F (11°C) SH, 15°F (8°C) SC, 95°F (35°C) Ambient (Solid Line Boundaries)
OEM tesng is required to monitor the DLT in the dashed line boundaries.
2600 -6000 RPM
2200 -6000 RPM
1800
-7200 RPM
Tcond
(°C)
Tevap (°C)
DLT < 275°F
1000*
-7200 RPM
An Oil Boost Cycle Is Required For Speeds 1000RPM 1800RPM
Cycle Parameters: 1000RPM-1800RPM For 2 Hours,
Ramp To 3600RPM For 5 Minutes
Min Speed Of 1000RPM
-32 -29
-26 -24 -21
-18 -15 -13 -10
-7
-4
-1
1
4
7
10
12
15
18
21
24
26
29
32
*Oil Boost Cycle