RGL_Unit_CO2_PT5/E/Rev00
4/5
5.
Fasten the brazed set to the bracket using the plastic clamp (C) [Key 10 mm]
– see
Figure 5
.
The plastic clamp can be placed in two different positions (
Figures 5 & 6
) because the partition wall is available
in two different versions, with the holes located in different positions.
Figure 5
Figure 6
6.
Connect the high-pressure hose with the Schraeder port on the shut-off valve of the liquid receiver as per
Figure 7
. Use the copper seal (F).
The high-pressure hose must be placed freely so that the Schraeder connection is not strained. The Schraeder
connection must be tightened to a torque of 16 to 18 Nm. Do not exceed 20 Nm in any case [Key 14 mm].
Figure 7