Emerson COPELAND EAZYCOOL Replacement Manuallines Download Page 4

 

RGL_Unit_CO2_PT5/E/Rev00 

 

4/5

 

5. 

Fasten the brazed set to the bracket using the plastic clamp (C) [Key 10 mm] 

– see 

Figure 5

The plastic clamp can be placed in two different positions (

Figures 5 & 6

) because the partition wall is available 

in two different versions, with the holes located in different positions. 

 

 

Figure 5 

Figure 6 

 
6. 

Connect  the  high-pressure  hose  with  the  Schraeder  port  on  the  shut-off  valve  of  the  liquid  receiver  as  per 

Figure 7

. Use the copper seal (F). 

The high-pressure hose must be placed freely so that the Schraeder connection is not strained. The Schraeder 
connection must be tightened to a torque of 16 to 18 Nm. Do not exceed 20 Nm in any case [Key 14 mm]. 

 

Figure 7 

 

 

Summary of Contents for COPELAND EAZYCOOL

Page 1: ...eps 1 Switch off the main switch to shut the unit down 2 Isolate the unit from the cooling circuit by closing the shut off valve on compressor discharge and the shut off valve on flashtank 3 Remove pressure charge from the liquid receiver of the unit including the whole discharge line and the gascooler 4 Install the PT5 kit as per instructions below 5 Switch on the main switch 6 Check the function...

Page 2: ...om the old pressure transducer and remove the PT5 from the port of the shut off valve Use a 1 4 NPT plug E with sealing glue Loctite to blind the shut off port Tighten the 1 4 NPT plug E to a tightening torque of 40 Nm 2 Remove the plastic plug from the metal partition wall 3 Remove the currently used plug on the Schraeder valve SAE 1 4 on the shut off valve Figure 2 1 2 3 ...

Page 3: ...artment area in Figure 4 2 Pull the cable of the old pressure transducer through the hole in the partition wall into the compressor compartment area see result in compressor compartment area in Figure 4 3 Blind the partition wall with the rubber stepper plug on the brazed set 4 Install the assembly bracket for the brazed set Key 13 mm see Figure 4 Figure 3 Figure 4 Compressor compartment area and ...

Page 4: ...different versions with the holes located in different positions Figure 5 Figure 6 6 Connect the high pressure hose with the Schraeder port on the shut off valve of the liquid receiver as per Figure 7 Use the copper seal F The high pressure hose must be placed freely so that the Schraeder connection is not strained The Schraeder connection must be tightened to a torque of 16 to 18 Nm Do not exceed...

Page 5: ..._CO2_PT5 E Rev00 5 5 7 After leak test has been performed insulate the Schraeder connection including the angle fitting of the high pressure hose using the insulation set G see Figures 8 and 9 Figure 8 Figure 9 ...

Reviews: