4.2.2. Connecting the power plant battery return reference (BRR) lead
Unless specifically instructed otherwise in the specifications or by the Customer,
the battery return reference (BRR) lead is usually connected as shown in Figure
4.4 and as described in Procedure 4.2.
CAUTION
Maintain the integrity of the grounding system.
To avoid the possibility of ground loops, which should
always
be avoided
, only one
battery return reference (BRR) lead is
required per system regardless of the number of frames in the
system.
Note 1:
The battery return reference cable should be sized equal to or larger
than the size of the largest distribution cable used in the power plant.
Note 2:
In some cases, the power plant battery return busbar may be
determined to be the SPG. In such cases, the BRR lead should be run to the
nearest FGB or BPG.
Note 3:
The front cover of the Battery Connection Module can be removed
completely to facilitate the cabling and connecting operations.
Figure 4.4 – Typical installation of the power system battery return reference ground lead
BRR
cable
BR busbar
SPG (see note 2)
NT6C75AA
Helios
Candeo
framework
BRR cable
(sized per
note 1)
BR busbar
NT6C75AA
Helios
Candeo
framework
BRR cable -
sized per note 1
Alternate method for
a bottom fed system
Raised
floor