Referring to the drawing below, follow the assembly sequence.
Fig. 3. pH, ORP, temperaure porbes installation.
pH/ORP/
temperature
probes
installation
1.
Open water flow into the cell turning water inlet valve.
2.
Turn until the float reaches the black mark on the cell.
3.
SEPR LED lights to indicate the proper flow into the cell.
Fig. 4. Correct float position
Commissioning