![Emec ECL12 Operating Manual Download Page 12](http://html1.mh-extra.com/html/emec/ecl12/ecl12_operating-manual_2399981012.webp)
12
Installation
1.
Secure amperometric cell on a stable wall by screwing the two fixing screws on the body of
the amperometric cell (
⎘
Dimensional).
2.
Connect water inlet and outlet to the pipe.
3.
We recommend the installation of a filter before the amperometric cell.
4.
Install pH, ORP and temperature probes (if any) in their seats.
5.
Connect SEPR and electrode to the instrument terminal board (refer to the manual of the
instrument).
Fig. 2. Amperometric cell installation
SEPR
Connect to the
instrument
WATER INLET
ELECTRODE
Connect to the
instrument
Temperature
pH or ORP probe
Water inlet valve
WATER OUTLET