![EMD EXP-103 Operation Manual Download Page 8](http://html1.mh-extra.com/html/emd/exp-103/exp-103_operation-manual_2399944008.webp)
8
OPERATION DESCRIPTION
3.1
INSTALLMENT
1) Apart all the wooden package. Avoid damaging the machine.
2) Move the machine to an installment position by fork lift.
3) Install master cover and tighten screws on both side.
4) Lift up the tower.
5) Fix and tighten the tower by M8 screws. Total 6 screws on each side.
6) Connect the sensor wires.
Proximity Switch: “
―”&
4.
7) Install the motor cover and support brackets.
Total 4 screws required.
Connect the power cable with the socket by a 110V/230V power.
Summary of Contents for EXP-103
Page 1: ...1 PALLET STRETCH WRAPPING MACHINE MODEL EXP 103 OPERATION MANUAL ...
Page 6: ...6 2 2 MACHINE DIMENSION ...
Page 7: ...7 2 3 MACHINE DESCRIPTION TURNTABLE SEAT CARRIAGE TOWER CONTROL BOX MOTOR COVER ...
Page 10: ...10 3 3 OPERATION OF CONTROL PANEL ...
Page 15: ...15 4 2 ELECTRICAL DIAGRAM Sensor limit switch location ...
Page 17: ...17 ...
Page 18: ...18 ...
Page 19: ...19 ...
Page 20: ...20 ...
Page 21: ...21 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 31: ...31 6 PART LIST 6 1 SEAT ...