Emcore Corporation
System 5000 series
Copyright © 2008 Emcore Corporation
MAN-5021T, Rev B
Installation
Module Installation
Apply DC power
Verify that the Power On, Laser Power and Laser Temp are illuminated.
The LED’s illuminated will be in respect to the device option selected.
Connect RF input and output signal cables.
Insert either a SC/APC or FC/APC connector of the fiber jumper in the fiber output
connector socket.
Insert the opposite end of the SC/APC connector of the fiber jumper to the appropriate fiber
receiver.
Verify that the Optical Power LED is now illuminated and that the link is established.
DC Interface (Table 01)
Pin
Number
Transmitter
1 +15
VDC
2 +5
VDC
3 Not
Used
4 Ground
5 Ground
6
Photodiode Current Monitor (Not Used_
7
Summary Alarm Common
8
Laser Current Monitor
9 Summary
Alarm