Installing the Hardware
Figure 13
Cabinet power switches and circuit breakers
4. Switch all SPS power switches (shown in
) ON.
Figure 14
SPS power switches
5. Switch both lower PDPs ON.
6. Switch ON each PDU circuit breaker that has components plugged into its power
strip. (
identifies the circuit breaker associated with each
power strip.)
7. Verify that the LED status on each SPS and director is as shown in
Generally, the SPS On-Battery LED stays on while the SPS units fully charge
(which could be a few minutes or a few hours, depending on the state of the
battery). If any amber LED not related to the SPS recharge remains on for
more than 10 minutes, verify that the components are cabled correctly.
Zep-013
The
u
pper PDUs are installed
u
pside-down from the lower PDUs.
The
u
pper PDPs are installed,
b
u
t are not
u
sed.
The
u
pper PDUs are not
u
sed in a
single-engine config
u
ration.
PDU circ
u
it
breakers
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
ON
I
OFF
O
PDP power
switch
PDP power
switch
Notes:
To 30 A, 220 VAC
power so
u
rce 1
To 30 A, 220 VAC
power so
u
rce 2
CL4171-zep
ON
ON
Summary of Contents for VPLEX
Page 8: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 8 Tables...
Page 20: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 20 Introduction...
Page 76: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 76 Setting up VPLEX...
Page 92: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 92 Reference...
Page 94: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 94 Index...